A four-storey courtyard building made of METALOQ frames

Cores and bracing

Individual modules carry their own bracing. In most buildings, stair and elevator cores add further lateral strength.

Diaphragms

Floor diaphragm loads pass from the deck to the joists, then to the rim floor beams, then through the columns and end plates to the dogbone plates. No topping slab is assumed.

Walls

Where modules meet, a wall has two sides, one on each module, separated by a thin gap. Many listed double-stud walls are available to the architect. The decoupled deck, double stud and insulation together give a sound rating of up to STC 65.

Floors

The structural floor is the floor frame of one module stacked on the ceiling frame of the module below. Listed floor and ceiling assemblies are available with cement board, magnesium oxide board and concrete decks. The decoupled floor and ceiling give a sound rating of up to STC 60, with fire ratings of one to two hours depending on the assembly.

Standard details

Skyhook maintains a library of fifteen standard details for METALOQ buildings, covering roof, stacked-floor and corridor joints between modules and six foundation conditions.

Chapter 4 in full

METALOQ Documentation v1.0, pages 39–46. Select a page to enlarge it.

4 Assemblies

4.1 Cores and Brace Frames

4.2 Diaphragms

4.3 Floor Assembly

4.4 Fire-Rated Assemblies

4 Assemblies, page 39
Page 39Enlarge
Read page 39 as text

CHAPTER

Assemblies

This chapter defines how METALOQ components combine into assemblies: the core and brace-frame systems, the floor and ceiling diaphragm, and the fire-rated wall and floor assemblies. Each is cross-referenced to the component-level and connection data in Chapter 3.

Where modules meet, an assembly has two sides, one on each module, separated by a thin gap along the mateline. Few generic tested assemblies exist at the floor and ceiling for this construction method, so the architect must select from the available listings to demonstrate fire and sound compliance.

WALLS

Approved assembly catalogues, such as those of UL and ULC, list many double-stud walls that an architect can choose from. The mateline gap at the floor requires particular attention. In Canada, that gap is within a concealed space and requires a fire block, which the NBC allows to be achieved by filling the wall with fibreglass insulation. The decoupled deck, the double stud, and the insulation together give the wall a high sound rating of up to STC 65.

FLOORS

Only a few floor assemblies have been tested using modular methods. In Canada, Part 9 of the NBC (Housing and Small Buildings) has no prescriptive assembly, so the rating must be achieved using a listed membrane ceiling, with or without resilient channel. In Part 3 buildings, available listings include USG Structo-Crete and ECTEK Megaboard. Both companies have proprietary listed floor–ceiling assemblies. Standard concrete-deck assemblies are also available. As with the walls, the decoupled floor–ceiling structure, with or without insulation, has a high sound rating of up to STC 60. UL H501 has also shown that insulation increases both the fire rating and the sound rating. Tested and candidate assemblies are listed in the Fire-Rated Assembly Matrix.

4 . 1 Cores and Brace Frames

Individual modules carry their own bracing; stair and elevator cores add further lateral strength in most METALOQ buildings.

4 . 2 Diaphragms

In a METALOQ floor, diaphragm loads transfer from the floor deck to the joists, then to the rim floor beams, and then through the columns and top and bottom end plate assemblies to the dogbone plates. Alternative floor deck materials are available, but must be checked against fire-rating requirements.

4 . 3 Floor Assembly

The METALOQ structural floor assembly consists of the floor frame of one module stacked on the ceiling frame below. This assembly must meet the requirements of local jurisdictions for fire and sound. Tests (such as UL H501) have shown that decoupled module frames have a higher fire and sound rating than traditional assemblies.

4 . 4 Fire-Rated Assemblies

Several UL and ULC listings are applicable to the METALOQ system. Fire-rated wall assemblies can use either gypsum or MgO board. Floor assemblies can use plywood, MgO board, concrete board (such as USG Structo-Crete), or a concrete deck. Each option suits different applications (see the expanded fire-rated section).

Fire-Rated Assembly Matrix

Fire-Rated Assembly Matrix, page 40
Page 40Enlarge
Read page 40 as text

Fire-Rated Assembly Matrix

FLOOR / CEILING ASSEMBLIES

Only a few modular floor-ceiling assemblies are listed in the UL and cUL directories. Those reviewed that apply to the METALOQ steel frame and its floor and ceiling joists are listed here.

ASSEMBLY LISTING / BASE RATING CANADA US SOUND BOARD / DECK BUILD-UP (top → bottom)

H501 / H517 — Structocrete UL/cUL H501 + H517 (BXUV+BXUV7) 1 hr / 2 hr* Yes Yes STC 48–57 IIC 45–59 †

¾″ USG Structo-Crete cement-fibre

H501 — Megaboard UL H501 (BXUVC) (Jan 2025) 2 hr TBC TBC not in listing 18 mm (¾″) Megaboard MgO T&G

H505 — Structocrete (corridor)

UL/cUL H505 (BXUV+BXUV7, 2020) 1 hr / 2 hr Yes Yes not in listing ¾″ USG Structo-Crete cement-fibre

UL/cUL H509 (BXUV+BXUV7, Apr 2026) 1 / 1.5 / 2 hr Yes Yes not in listing ¾″ Megaboard MgO T&G

H509 — Megaboard

G588 — Structocrete UL/cUL G588 (BXUV+BXUV7, 2023) 1 / 1.5 / 2 hr Yes Yes not in listing ¾″ USG Structo-Crete cement-fibre

* 2 hr with the 3½″ mineral wool. Sources: UL/cUL Product iQ fire-resistance designs, and the ECTEK Megaboard drawings and evaluation report (IAPMO-UES ER-808). BXUV is the US listing (ANSI/UL 263); BXUV7 is the Canadian listing (CAN/ULC-S101). TBC = not yet confirmed for that country. Each listing was tested with its own framing and connections, which differ from the METALOQ clamp and two-joist module, so using one on a METALOQ project needs an engineering judgement from the project’s fire engineer, and a Canadian (BXUV7 or accredited Canadian) basis for use in Canada. No fire listing carries STC or IIC data; elsewhere the sound column lists the insulation only.

† Laboratory tests of the H517 assembly (NGC Testing Services, NVLAP-accredited, 2021; ASTM E90 / E413 and E492 / E989), eight specimens with LVT, LVT on 2 mm or 5 mm underlayment, or ceramic tile: STC 48–50 and IIC 45–53 with the listed ⅝″ gypsum ceiling on furring; STC 54–57 and IIC 55–59 with a separate steel-stud ceiling below. Tested specimens, not a METALOQ module: confirm the rating for each project.

WALL ASSEMBLIES

Many wall assemblies work with the METALOQ system, and only a selection is listed here. The architect chooses the assembly to suit the manufacturer’s choice of materials. Two questions narrow the choice:

1. Is the wall an exterior wall or an interior mateline wall? Interior partitions are not affected by the METALOQ system and are not listed. 2. Are the studs load-bearing or non-load-bearing, and are they cold-formed steel (CFS) or wood?

Under the US building code (IBC), columns of the primary structural frame must be individually encased unless they are integral to a light- frame wall and sit entirely between its top and bottom tracks.4 A METALOQ frame is cold-formed steel. Make the module’s wall studs load- bearing, keep each column within the wall’s tracks, and the frame and studs act together as one CFS load-bearing stud wall. That wall’s listed assembly then rates both. In Canada (NBC), the columns need a rating not less than the floor they support, and a tested load-bearing wall assembly provides it. Confirm the approach with the authority having jurisdiction.

¾″ Structo-Crete deck 6″ CFS floor joist + 4″ CFS ceiling joist @24″ 3½″ mineral wool (2 hr) resilient ch. ⅝″ Type-C gyp

18 mm Megaboard deck hot-rolled H250 framing + 10″ CFS floor joist + ceiling C-joist 40 kg/m³ mineral wool Stack-Hat furring 2× ⅝″ Type-C gyp

¾″ Structo-Crete deck single 8″ CFS joist @24″ 3½″ batt resilient ch. ⅝″ gyp ceiling

¾″ Megaboard deck single 10″ CFS C-joist @24″ resilient ch. batt ⅝″ Type-C gyp ceiling

¾″ Structo-Crete deck (2 hr: + underlayment or topping) 6–10″ CFS floor joist @24″ 2″ min gap + 3½″ CFS ceiling joist @16″ resilient ch. ⅝″ gyp ceiling

LOAD-BEARING NON-LOAD-BEARING

U425 (CFS)1

Exterior

U423 (CFS)1

U419 (CFS)3

U354 (wood)1

V446 (CFS, double row)1

W449 (CFS, double row, ULC)5

Interior mateline

U493 (CFS, double row)3

ER-710 (CFS, Megaboard)3

U425 (CFS)1, 2

Example UL, cUL and ULC designs only: the architect selects, details and confirms the assembly for each project. Listings as reviewed November 2026. Directories are revised often: confirm the current version of any listing before use.

1 Evaluated by working-stress design. Under limit-states design (Canada), the listing requires a load restriction factor.

2 At a mateline with a module wall on one side only. Board both faces. Two walls, each boarded on one side only, do not match U425: use V446 or W449.

3 Magnesium-oxide board (Megaboard) may replace gypsum only where a listing or evaluation report names it. IAPMO-UES ER-710 rates a 2 hr load-bearing interior wall of 3⅝″ steel studs at 16″, faced both sides with ⅝″ Megaboard. ER-710 is a US evaluation report: confirm Canadian acceptance and that the report is current.

4 IBC 2024 Section 704.2, Exception 3, and Section 704.3.1 (light-frame construction). NBC 2025 Article 3.1.7.5.

5 METALOQ matelines keep a gap of 1″ (25 mm) at most, for fire blocking. At a 25 mm gap, W449 lists one board maker only (Item 4A); the other listed boards need a 50 mm gap (Item 4).

Fire-Rated Assemblies — Detail

Fire-Rated Assemblies — Detail, page 41
Page 41Enlarge
Read page 41 as text

Fire-Rated Assemblies — Detail

DETAILS ON THE PAGES THAT FOLLOW

Row 1 · Roof Matelines 42

M1.D2.01 1.C

MODULAR PARAPET COMPLETE W

WALL, INSULATION AND TYPE X G

FIRE SEPARATION CONT

M1.D2.02

M1.D2.03

SITE FILL MATELINE G SPRAY FOAM OR FOA

OVER MATE

BOLT CFS CHANNELS AT OPENING AVB OVER CHANNELS - APPLY SEA

AVB BEFORE NEXT MODULE

FLAT ROOF FASTENER

STRESS P

1' - 6"

RIGID INSULATION B TAPERED LAYER COMPLE

MODULAR FLAT ROOF AS

MODULAR FLAT ROOF ASSEMB INSULATION BASE AND TAPERE

COMPLETE WITH ROOF ME

PREFIN. METAL CO

CLIPPED OVER CL

2" - 4"

BLADE CONNECTION FOR HOOKS AT POINT LOAD LOC

ROOF ME

BLADE CONNECTION FO HOOKS AT POINT LOAD LOC

EXTERIOR ARCHITECT CLADDING PANEL ON C

REMOVE AFTER

1' - 6"

07 50 00

REMOVE AFTER

07 50 00

1' - 6"

SEMI-RIGID CONTINU

INSULATION BO

07 50 00

07 21 13.BD5

10" x 10" CEILING PAN CONNECTION POI PATCH AND FIRE T

07 21 13.BD5

07 27 00.A1

CAULK TO EQUAL RATING AFTER SET

07 27 00.A1

06 16 10

CONTINUOUS AIR-VA BARRIER AROUND RIM

06 16 10

PT PLYWOOD EXTE

SHEAT

09 29 00.A4

09 22 13.23

06 16 10 09 22 16.13 09 29 00.B4

07 46 46.01 07 21 13 07 27 00.A1

ULK / TAPE AT MATELINE IF RATED

09 29 00.B4 09 22 13.23

09 29 00.B4 09 22 16.13

LT GWB ON MODULAR WALL

R INCOMPLETE STUD WALL TE WITH CFS STUDS AND

10" x 10" CEILING PANEL AT CON POINTS - PATCH AND FIRE TAPE

Row 2 · Stacked Floor Matelines 43

M1.D2.08

1" MIN. 1HR FRR AS PER UL

DAGGER CONNEC BETWEEN STACKED MOD

M1.D2.07

M1.D2.09

09 29 00.B4 09 22 16.13 06 16 23

07 46 46.01 07 46 46

07 21 13

06 16 23

06 16 23 OINT TRIM

09 22 16.13 09 29 00.A3

06 16 10

METAL THRU-WALL FLASH 24 Ga. - EXTEND TO COUN FASTENER LINE - CLIP ON C

CLADDING BASE TRIM

PRE-COMPRESSED SILICONE SEALANT - O

D

09 29 00.B4

SIDE OF THE R

09 22 13.23 09 22 16.13

10" x 10" CEILING PANE CONNECTION POINTS - PA AND FIRE TAPE / CAULK TO EQ

WRAP AVB OVER CORNERS - TERMINATE W

09 29 00.A4 09 22 13.23

FIRE RATING AFTER SET

09 29 00.B4

09 22 13.23 10" x 10" CEILING PANEL AT CON

LK / TAPE AT MATELINE IF RATED

09 22 16 13

LT GWB ON MODULAR WALL

Row 3 · Corridor Matelines 44

1.3

OVER MATELINE GA

1.3

M1.D2.04

RIGID INSULATION BASE AN TAPERED LAYER COMPLETE WI

MODULAR FLAT ROOF ASSEMBL

M1.D2.05

0' - 5 1/4" 0' - 9 17/32"

M1.D2.06

1' - 2"

1' - 6"

ROOF MEMBRA

STEEL FLUSH UNIT ENTRA

2" - 4"

SITE FILL MATELINE GAP WIT SPRAY FOAM OR FOAM BOA

08 71 00.18

UNIT ENTRANCE ALCOVE - W

DOOR ON HM FR

09 29 00.B4 09 22 16.13 RESILIENT CHANNEL AND TYPE X GWB

ON CORRIDOR SIDE ARE APPLIED ON

BLADE CONNECTION FOR LIFT HOOKS AT POINT LOAD LOCATION

06 16 23

FRR TYPE X GWB ARO

FLOOR JOINT T

SITE - TIGHTLY FILL WITH BATTING AFTER CONNECTIONS ARE COMPLETE UNIT SIDE CORRIDOR SIDE

06 16 23

07 50 00

REMOVE AFTER SETTIN

UNIT SIDE CORRIDOR S

07 27 00.A1

1' - 7 5/8"

1' - 8 1/4"

06 16 10

09 29 00.A4

09 22 13.23

SITE BUILT TYPE X GWB AND RESILIE

BULKHEAD OVER STIFFENER PLATES -

CHANNEL ON MODULAR STU

09 29 00.B4

BULKHEAD OVER STIFFENER PLAT

09 29 00.B4

09 22 16.13 09 22 13.23

KEEP FRR ASSSEMBLY CONTINUOUS

FIRE CAULK / TAPE AT CORNERS

FRR STUD WALL - WITH PIPE SHA

WHERE INDICATED ON PLA

09 22 13.23

KEEP FRR ASSSEMBLY CONTINUO

FRR STUD WALL - WITH PIPE SHAFT

Row 4 · Foundation ⁄ Wall Base I 45

ROUGH INTERIOR CEILING

1.C

M1.D1.01

SEMI-RIGID CONT INSULATION BOARD W/

M1.D1.06

SEMI-RIGID CON INSULATION BOARD W

PANEL M1.D1.05

BROKEN CLIP AND 07 46 46 07 46 46.01

AP#1: LEAVE SHEATHING STRUCTURAL CONNECTION

07 46 46 07 46 46.01

BROKEN CLIP AN

07 46 46 07 46 46.01

EXTERIOR ARCHITECTURAL C

07 21 13

PATCH ALL EXTERIOR 06 16 10

07 21 13

06 16 10

AP#1: LEAVE SHEATHIN STRUCTURAL CONNECTION

07 21 13

SEMI-RIGID CON INSULATION BOARD W

09 22 16.13

07 27 00.A1

AP#2: CEILING GAP AT CONN POINTS - PATCH AND FIRE TAPE

07 27 00.A1 09 22 16.13

AP#2: CEILING GAP AT CON POINTS - PATCH AND FIRE TAPE

PATCH ALL EXTERIOR

07 27 00.A1

06 16 10

BROKEN CLIP AN PLANT NOTE: LEAVE SHEATH

09 29 00.B4 06 16 23

2 LYRS TYPE X 5/8" GWB CHANNEL WITH ABSO

TO EQUAL FIRE

09 29 00.B4 06 16 23

TO EQUAL FIRE

09 22 16.13

09 29 00.B4 06 16 23

AT STRUCTURAL CON POINTS - PATCH ALL EXTERIOR

09 29 00.B4

09 22 13.23

MATERIAL IN

SEAL AVB TRANSITION W 09 22 13.23

MODULE WALL BASE TRIM (24 G

SILICONE SEAL OR PRECOMPRESS

SEAL AT CONCRETE/STILL INTER

SILICONE SEAL OR PRECOMPRESSE

SEAL AT CONCRETE/STILL INTER

09 29 00.B4

BENT OVER SILL BLOCK - SEA

F

ANCHOR BOLT CONNECTION

SEAL MEMBRAN

ANCHOR BOLT CONNECTION -

SEAL MEMBRANE

SITE BUILT STEEL FRAMING - WRAP WITH

PARGING OR 18 Ga. PREF GRADE BEAM POURED ON SCR

BEAMS HAVE TO BE

MODULE WALL BASE TRIM (24 G

PLATES HAVE TO BE L

OPTIONAL: BRICK VENEER ANCHORING ASSEMBLY - S

TYPE X GWB FRO

BENT OVER SILL BLOCK - SEA

FL

MEP BULKHEAD - 1/2" GWB

07 26 16.A1

GUSSET PLATE W BOLTED STEEL ANCHO

SITE BUILT BASEMEN GUSSET PLATE ON SET AN

FILL WITH GROUT

2" FURRING PROFILES -

IN BEAM AFT 07 21 13.BD1

1' - 1"

UNDERGROUND M BARRIER OR DRAINAG

0' - 6"

MEP BULKHEAD - 1/2" GWB B

2" FURRING PROFILES -

GRANULAR LAYER

MIN

OPTIONAL: BRICK VENEER

COMPRESSED EARTH

Row 5 · Foundation ⁄ Wall Base II 46

1.C

M1.D1.04

1.C

M1.D1.02 1.C

M1.D1.03

EXTERIOR ARCHITECTURAL C

07 46 46 07 46 46.01

EXTERIOR ARCHITECTURAL C

07 46 46 07 46 46.01

EXTERIOR ARCHITECTURAL C

PANEL O

07 46 46 07 46 46.01

SEMI-RIGID CON INSULATION BOARD W

PANEL

07 21 13

SEMI-RIGID CONT INSULATION BOARD W/

PANEL O

07 21 13

SEMI-RIGID CON INSULATION BOARD W

07 21 13

BROKEN CLIP AN

07 27 00.A1

06 16 10

BROKEN CLIP AND

06 16 10

07 27 00.A1

BROKEN CLIP AN

07 27 00.A1

06 16 10

AT STRUCTURAL CON POINTS - PATCH ALL EXTERIOR

PLANT NOTE: LEAVE SHEATH

09 22 16.13

09 29 00.B4 06 16 23

AT STRUCTURAL CONN POINTS - PATCH ALL EXTERIOR

PLANT NOTE: LEAVE SHEATH

09 22 16.13

09 29 00.B4 06 16 23

PLANT NOTE: LEAVE SHEATHING

STRUCTURAL CONNECTION

PATCH ALL EXTERIOR

09 22 16.13

09 29 00.B4 06 16 23

SILICONE SEAL OR PRECOMPRESS

SEAL AVB TRANSITION WI

SILICONE SEAL OR PRECOMPRESS

SEAL AT CONCRETE/STILL INTER

SEAL MEMBRANE

PT PLYWOOD BLOCKING - SIT

SEAL MEMBRANE

TRIM PROFILE AT WALL BASE

CLOSE CONNECTION ACCESS GAP WITH RIGID BOARD INSULATION - B

STEEL GUSSET PLATE - FILL UN

WITH GROUT AFTER LE

CLOSE CONNECTION ACCESS GAP WITH RIGID BOARD INSULATION -

PARGING OR 18 Ga. PREFIN

TO ALIGN WITH DRAIN

07 21 13.BD1

CLOSE CONNECTION ACCESS GAP WITH RIGID BOARD INSULATION -

TO ALIGN WITH DRAIN

PARGING OR 18 Ga. PREFI

TO ALIGN WITH DRAI

07 26 16.A1

1' - 0"

PRE-ENG. FOUN ANCHOR RODS TO STEEL FOUNDATION

GRANULAR LAYER

1' - 0"

PARGING OR 18 Ga. PREFI

BY OTHERS

07 21 13.BD1

07 26 16.A1

PT PLYWOOD E

07 21 13.BD1

COMPRESSED EARTH

UNDERGROUND M BARRIER OR DRAINAG

GRANULAR LAYER

WEEP TILES FOUNDATION PE

SH

GRANULAR LAYER

UNDERGROUND M BARRIER OR DRAINAG

COMPRESSED EARTH

COMPRESSED EARTH 0' - 6"

0' - 6"

Common Detail Library (DOTS — Details Off The Shelf)

Common Detail Library (DOTS — Details Off The Shelf), page 42
Page 42Enlarge
Read page 42 as text

Common Detail Library (DOTS — Details Off The Shelf)

This library presents the standard assembly details from Skyhook’s METALOQ “DOTS” set (sheets M1.D1.01 to M1.D2.09), cross-referenced to the fire-rated assemblies narrative and the expanded detail section. Five spreads follow, each with three sheets: roof matelines, stacked floor matelines, corridor matelines, and six foundation-to-wall-base conditions. Each sheet carries its own keynote legend for the material callouts.

DETAILS OFF THE SHELF Row 1 — Roof Matelines

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A4 5/8" GYPSUM WALLBOARD 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 21 13 BOARD INSULATION 07 21 13.BD5 EXTRUDED POLYSTYRENE (XPS) BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A4 5/8" GYPSUM WALLBOARD 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD 1.B

WRAP ROOF MEMBRANE OVER PARAPET ON SITE - COMPLETE WITH PREFIN. METAL

1.B

COPING CLIPPED OVER MODULAR CLEATS

MODULAR PARAPET COMPLETE WITH STUD

WALL, INSULATION AND TYPE X GWB FOR

FIRE SEPARATION CONTINUATION

BOLT CFS CHANNELS AT OPENINGS, WRAP AVB OVER CHANNELS - APPLY SEALANT ON

AVB BEFORE NEXT MODULE SETTING

MODULAR FLAT ROOF ASSEMBLY: RIGID INSULATION BASE AND TAPERED LAYER

COMPLETE WITH ROOF MEMBRANE

BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -

1' - 6"

REMOVE AFTER SETTING

1' - 6"

07 50 00

07 21 13.BD5

07 27 00.A1

06 16 10

09 29 00.A4

09 22 13.23

06 16 10 09 22 16.13 09 29 00.B4

09 29 00.B4 09 22 16.13

ULC W484

10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

0' - 1" MIN.

TO EQUAL FIRE RATING AFTER SETTING

M1 - DOTS - ROOF MATELINE - FRR WALL 1

M1 - DOTS - ROOF PARAPET 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

ROOF MATELINE - FRR WALL

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

Project number Date Drawn by Checked by www.skyhookmodular.com

480 Brock Ave. Toronto, ON, M6H 3N3

Project number Date Drawn by Checked by www.skyhookmodular.com

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D2.01

2026-07-30 BI DW

Details OTS

Scale

1 : 10

2026-10-16 1:04:44 PM

M1.D2.01 Roof Mateline — FRR Wall

M1.D2.02 Roof Parapet

This roof detail shows the mateline between two METALOQ modules at a fire-resistance-rated wall, where the modular parapet carries the fire separation up to the roof.

This roof detail shows the parapet at the exterior wall, where a prefinished metal coping clips over cleats above the cladding.

Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D2.01, M1.D2.02, M1.D2.03, 1 : 10, shown reduced. Each sheet carries its own keynote legend; Addendum 1 reproduces every sheet at 100 %.

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 21 13.BD5 EXTRUDED POLYSTYRENE (XPS) BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

FLAT ROOF FASTENER WITH

STRESS PLATE

SITE APPLIED ROOF MEMBRANE

OVER MATELINE GAP

1.C

SITE FILL MATELINE GAP WITH SPRAY FOAM OR FOAM BOARD

FLAT ROOF FASTENER WITH

MODULAR FLAT ROOF ASSEMBLY:

STRESS PLATE

RIGID INSULATION BASE AND TAPERED LAYER COMPLETE WITH

1' - 6"

PREFIN. METAL COPING

ROOF MEMBRANE

CLIPPED OVER CLEATS

2" - 4"

EXTERIOR ARCHITECTURAL

BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -

CLADDING PANEL ON CLIPS

REMOVE AFTER SETTING

SEMI-RIGID CONTINUOUS

INSULATION BOARD

07 50 00

10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE /

07 21 13.BD5

CAULK TO EQUAL FIRE RATING AFTER SETTING

07 27 00.A1

CONTINUOUS AIR-VAPOR BARRIER AROUND RIM BEAM

06 16 10

PT PLYWOOD EXTERIOR

SHEATHING

09 29 00.B4 09 22 13.23

FIRE CAULK / TAPE AT MATELINE IF RATED

07 46 46 07 46 46.01 07 21 13 07 27 00.A1

SITE BUILT GWB ON MODULAR WALL

MODULAR INCOMPLETE STUD WALL COMPLETE WITH CFS STUDS AND GWB

10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

TO EQUAL FIRE RATING AFTER SETTING

0' - 1"

M1 - DOTS - ROOF MATELINE - INTERIOR WALL 1

SCALE: 1 : 10 M1.01

ROOF PARAPET

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

ROOF MATELINE - INTERIOR WALL

Project number Date Drawn by Checked by www.skyhookmodular.com

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D2.02

M1.D2.03

2026-07-30 BI DW

Details OTS

Scale

1 : 10

Scale

1 : 10

2026-10-16 1:04:50 PM

2026-10-16 1:04:59 PM

M1.D2.03 Roof Mateline — Interior Wall

This roof detail shows the mateline between two METALOQ modules over an interior wall, where the gap is filled on site and closed with a site-applied roof membrane.

Page 43, page 43
Page 43Enlarge
Read page 43 as text

DETAILS OFF THE SHELF Row 2 — Stacked Floor Matelines

Keynote Legend

Key Value Keynote Text

06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD 1.B

1.B

1" MIN. 1HR FRR AS PER UL U493

DAGGER CONNECTION BETWEEN STACKED MODULES

09 29 00.B4 09 22 16.13 06 16 23

09 29 00.B4

09 22 13.23 09 22 16.13

10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK TO EQUAL

09 29 00.B4

FIRE RATING AFTER SETTING

09 22 13.23 10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

09 22 16.13

M1 - DOTS - STACKED FLOOR MATELINE - FRR WALL 1

M1 - DOTS - EXTERIOR WALL STACK MATELINE 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

STACKED FLOOR MATELINE - FRR WALL

MLQ-DOTS-01 METALOQ

480 Brock Ave. Toronto, ON, M6H 3N3

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D2.08

Project number Date Drawn by Checked by www.skyhookmodular.com

2026-07-30 BI DW

Details OTS

Scale

1 : 10

2026-10-16 1:05:12 PM

M1.D2.08 Stacked Floor Mateline — FRR Wall

M1.D2.07 Exterior Wall Stack Mateline

This floor detail shows the dagger connection between stacked METALOQ modules at a 1-hour fire-resistance-rated wall to UL U493.

This exterior wall detail shows the joint between stacked METALOQ modules, with metal through- wall flashing and a cladding base trim that lets the wall drain.

Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D2.08, M1.D2.07, M1.D2.09, 1 : 10, shown reduced. Each sheet carries its own keynote legend; Addendum 1 reproduces every sheet at 100 %.

Keynote Legend

Key Value Keynote Text

06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A3 1/2" GYPSUM WALLBOARD 09 29 00.A4 5/8" GYPSUM WALLBOARD

1.C

07 46 46.01 07 46 46

09 22 16.13 09 29 00.A3

07 21 13

06 16 23 FLOOR JOINT TRIM

06 16 23

06 16 10

METAL THRU-WALL FLASHING - MIN.

24 Ga. - EXTEND TO COUNTERSUNK FASTENER LINE - CLIP ON CLADDING

CLADDING BASE TRIM - ALLOW

DRAINAGE

PRE-COMPRESSED FOAM OR SILICONE SEALANT - OVER WEB

SIDE OF THE RIM JOIST

WRAP AVB OVER MODULE CORNERS - TERMINATE WITH TAPE

09 29 00.A4 09 22 13.23

OVER

FIRE CAULK / TAPE AT MATELINE IF RATED

SITE BUILT GWB ON MODULAR WALL

MODULAR INCOMPLETE STUD WALL COMPLETE WITH CFS STUDS AND GWB

10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

TO EQUAL FIRE RATING AFTER SETTING

0' - 1 1/2"

M1 - DOTS - STACKED FLOOR MATELINE - INTERIOR WALL 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

EXTERIOR WALL STACK MATELINE

MLQ-DOTS-01 METALOQ

STACKED FLOOR MATELINE - INTERIOR WALL

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D2.07

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D2.09

2026-07-30 BI DW

Details OTS

Scale

1 : 10

Scale

1 : 10

2026-10-16 1:05:02 PM

2026-10-16 1:05:23 PM

M1.D2.09 Stacked Floor Mateline — Interior Wall

This floor detail shows the mateline between stacked METALOQ modules at an interior wall, where the modular stud wall is completed on site with CFS studs and gypsum wallboard.

Page 44, page 44
Page 44Enlarge
Read page 44 as text

DETAILS OFF THE SHELF Row 3 — Corridor Matelines

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 29 00.A4 5/8" GYPSUM WALLBOARD

06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 08 71 00.18 WEATHERSTRIPPING, THRESHOLDS AND SEALS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

FLAT ROOF FASTENER WITH

STRESS PLATE

SITE APPLIED ROOF MEMBRANE

1.3

OVER MATELINE GAP

MODULAR FLAT ROOF ASSEMBLY:

0' - 5 1/4" 0' - 9 17/32"

RIGID INSULATION BASE AND TAPERED LAYER COMPLETE WITH

1' - 6"

ROOF MEMBRANE

SITE FILL MATELINE GAP WITH SPRAY FOAM OR FOAM BOARD

2" - 4"

08 71 00.18

BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -

06 16 23

REMOVE AFTER SETTING

07 50 00

UNIT SIDE CORRIDOR SIDE

07 27 00.A1

1' - 7 5/8"

06 16 10

09 29 00.A4

09 22 13.23

SITE BUILT TYPE X GWB AND RESILIENT

CHANNEL ON MODULAR STUDS

09 29 00.B4

FRR STUD WALL - WITH PIPE SHAFT

09 22 16.13 09 22 13.23

WHERE INDICATED ON PLAN

M1 - DOTS - CORRIDOR MATELINE - ROOF LEVEL 1

M1 - DOTS - CORRIDOR MATELINE - TYP. AT UNIT ENTRANCE 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

CORRIDOR MATELINE - TYP. AT UNIT ENTRANCE

MLQ-DOTS-01 METALOQ

480 Brock Ave. Toronto, ON, M6H 3N3

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D2.04

Project number Date Drawn by Checked by www.skyhookmodular.com

2026-07-30 BI DW

Details OTS

Scale

1 : 10

2026-10-16 1:05:00 PM

M1.D2.04 Corridor Mateline — Roof Level

M1.D2.05 Corridor Mateline — Typ. at Unit Entrance

This corridor detail shows the mateline at the corridor wall at roof level, where the gap is filled on site and closed with a site-applied roof membrane.

This corridor detail shows the mateline at a unit entrance, where Type X gypsum wallboard wraps the entrance alcove around a steel door on a hollow-metal frame.

Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D2.04, M1.D2.05, M1.D2.06, 1 : 10, shown reduced. Each sheet carries its own keynote legend; Addendum 1 reproduces every sheet at 100 %.

Keynote Legend

Key Value Keynote Text

06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

1.3

1' - 2"

STEEL FLUSH UNIT ENTRANCE

09 29 00.B4 09 22 16.13 RESILIENT CHANNEL AND TYPE X GWB

DOOR ON HM FRAME

UNIT ENTRANCE ALCOVE - WRAP

ON CORRIDOR SIDE ARE APPLIED ON

FRR TYPE X GWB AROUND

SITE - TIGHTLY FILL WITH BATTING AFTER CONNECTIONS ARE COMPLETE UNIT SIDE CORRIDOR SIDE

06 16 23

FLOOR JOINT TRIM

1' - 7 5/8"

1' - 8 1/4"

BULKHEAD OVER STIFFENER PLATES -

09 29 00.B4

KEEP FRR ASSSEMBLY CONTINUOUS

BULKHEAD OVER STIFFENER PLATES -

09 22 16.13 09 22 13.23

FIRE CAULK / TAPE AT CORNERS

KEEP FRR ASSSEMBLY CONTINUOUS

FIRE CAULK / TAPE AT CORNERS

FRR STUD WALL - WITH PIPE SHAFT

WHERE INDICATED ON PLAN

FRR STUD WALL - WITH PIPE SHAFT

WHERE INDICATED ON PLAN

M1 - DOTS - CORRIDOR MATELINE - TYP. AT SHAFT LOCATIONS 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

CORRIDOR MATELINE - TYP. AT UNIT ENTRANCE

MLQ-DOTS-01 METALOQ

CORRIDOR MATELINE - TYP. AT SHAFT LOCATIONS

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D2.05

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D2.06

2026-07-30 BI DW

Details OTS

Scale

1 : 10

Scale

1 : 10

2026-10-16 1:05:01 PM

2026-10-16 1:05:02 PM

M1.D2.06 Corridor Mateline — Typ. at Shaft Locations

This corridor detail shows the mateline at a pipe shaft, where resilient channel and Type X gypsum wallboard are installed on the corridor side after the connections are complete.

Page 45, page 45
Page 45Enlarge
Read page 45 as text

DETAILS OFF THE SHELF Row 4 — Foundation ⁄ Wall Base I

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

STR. CONNECTION ACCESS OPTIONS: AP#1 - THROUGH EXTERIOR SHEATHING AP#2 - THROUGH INTERIOR CEILING

1.C

STR. CONNECTION ACCESS OPTIONS: AP#1 - THROUGH EXTERIOR SHEATHING AP#2 - THROUGH INTERIOR CEILING

1.C

SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.

BROKEN CLIP AND Z- GIRT 07 46 46 07 46 46.01

07 46 46 07 46 46.01

AP#1: LEAVE SHEATHING OUT AT STRUCTURAL CONNECTION POINTS -

07 21 13

PATCH ALL EXTERIOR LAYERS 06 16 10

06 16 10

07 27 00.A1

09 22 16.13

AP#2: CEILING GAP AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

07 27 00.A1 09 22 16.13

09 29 00.B4 06 16 23

TO EQUAL FIRE RATING

09 29 00.B4 06 16 23

2 LYRS TYPE X 5/8" GWB ON RES. CHANNEL WITH ABSORPTIVE

09 22 13.23

SEAL AVB TRANSITION WITH TAPE 09 22 13.23

0' - 11 3/8" 0' - 1 3/4"

09 29 00.B4

MATERIAL IN CAVITY

SILICONE SEAL OR PRECOMPRESSED FOAM

1' - 1 1/8" 1' - 1 1/8"

09 29 00.B4

SEAL AT CONCRETE/STILL INTERFACE TO

SEAL MEMBRANE LAYERS

ANCHOR BOLT CONNECTION - GUSSET

PLATES HAVE TO BE LEVELED

MODULE WALL BASE TRIM (24 Ga) TO BE

BENT OVER SILL BLOCK - SEAL UNDER

FLASHING

SITE BUILT BASEMENT WALL - GUSSET PLATE ON SET ANCHORS -

FILL WITH GROUT BELOW

MEP BULKHEAD - 1/2" GWB BUILT ON

0' - 6"

2" FURRING PROFILES - BRACED

MIN.

OPTIONAL: BRICK VENEER AND TIE ANCHORING ASSEMBLY - SITE BUILT

M1 - DOTS - FOUNDATION @ WALL BASE - CONCRETE BASEMENT 1

M1 - DOTS - FOUNDATION @ WALL BASE - STEEL PODIUM 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

FOUNDATION @ WALL BASE - FOUNDATION WALL

MLQ-DOTS-01 METALOQ

480 Brock Ave. Toronto, ON, M6H 3N3

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D1.01

Project number Date Drawn by Checked by www.skyhookmodular.com

2026-07-30 BI DW

Details OTS

Scale

1 : 10

2026-10-16 1:04:13 PM

M1.D1.01 Foundation @ Wall Base — Concrete Basement

M1.D1.06 Foundation @ Wall Base — Steel Podium

This foundation detail shows a METALOQ module wall base anchored to a site-built concrete basement wall on a gusset plate set on anchors and grouted below.

This foundation detail shows a METALOQ module wall base on a site-built steel podium, with the podium framing wrapped in two layers of Type X gypsum wallboard.

Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D1.01, M1.D1.06, M1.D1.05, 1 : 10, shown reduced. Each sheet carries its own keynote legend; Addendum 1 reproduces every sheet at 100 %.

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

1.C

SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.

BROKEN CLIP AND Z- GIRT

07 46 46 07 46 46.01

EXTERIOR ARCHITECTURAL CLADDING

AP#1: LEAVE SHEATHING OUT AT STRUCTURAL CONNECTION POINTS -

PANEL ON CLIPS

SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.

PATCH ALL EXTERIOR LAYERS

07 21 13

07 27 00.A1

BROKEN CLIP AND Z- GIRT PLANT NOTE: LEAVE SHEATHING OUT

AP#2: CEILING GAP AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK

06 16 10

09 22 16.13

TO EQUAL FIRE RATING

09 29 00.B4 06 16 23

AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS

SILICONE SEAL OR PRECOMPRESSED FOAM

MODULE WALL BASE TRIM (24 Ga) TO BE

0' - 5 3/8" 0' - 6"

SEAL AT CONCRETE/STILL INTERFACE TO

BENT OVER SILL BLOCK - SEAL UNDER

SEAL MEMBRANE LAYERS

FLASHING

ANCHOR BOLT CONNECTION - GRADE

SITE BUILT STEEL PODIUM FRAMING - WRAP WITH 2 LYRS.

BEAMS HAVE TO BE LEVELED

GRADE BEAM POURED ON SCREW PILES

TYPE X GWB FROM INSIDE

PARGING OR 18 Ga. PREFIN. METAL

COVER

OPTIONAL: BRICK VENEER AND TIE ANCHORING ASSEMBLY - SITE BUILT

GUSSET PLATE WITH PRE- BOLTED STEEL ANCHORS - SET

MEP BULKHEAD - 1/2" GWB BUILT ON

07 26 16.A1

IN BEAM AFTER POUR 07 21 13.BD1

1' - 1"

2" FURRING PROFILES - BRACED

UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD

GRANULAR LAYER

COMPRESSED EARTH

AS PER BEAM SIZE AND DAGGER SLIP LOCATION

M1 - DOTS - FOUNDATION @ WALL BASE - STEEL PILE 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

FOUNDATION @ WALL BASE - STEEL PODIUM

MLQ-DOTS-01 METALOQ

FOUNDATION @ WALL BASE - STEEL PILE

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D1.06

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D1.05

2026-07-30 BI DW

Details OTS

Scale

1 : 10

Scale

1 : 10

2026-10-16 1:04:36 PM

2026-10-16 1:04:31 PM

M1.D1.05 Foundation @ Wall Base — Steel Pile

This foundation detail shows a METALOQ module wall base on a grade beam poured on screw piles, with a gusset plate set in the beam after the pour.

Page 46, page 46
Page 46Enlarge
Read page 46 as text

DETAILS OFF THE SHELF Row 5 — Foundation ⁄ Wall Base II

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD 1.C

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

1.C

07 46 46 07 46 46.01

EXTERIOR ARCHITECTURAL CLADDING

PANEL ON CLIPS

07 21 13

07 27 00.A1

SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.

07 27 00.A1

06 16 10

BROKEN CLIP AND Z- GIRT

09 22 16.13

PLANT NOTE: LEAVE SHEATHING OUT

09 29 00.B4 06 16 23

AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS

09 29 00.B4 06 16 23

0' - 5 3/8" 0' - 6"

SEAL AVB TRANSITION WITH TAPE

PT PLYWOOD BLOCKING - SITE WORK

CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP

TO ALIGN WITH DRAIN CAVITY

PARGING OR 18 Ga. PREFIN. METAL

07 21 13.BD1

0' - 7 1/4" 0' - 6"

COVER

0' - 6"

07 26 16.A1

1' - 0"

PRE-ENG. FOUNDATION ANCHOR RODS TO SECURE STEEL FOUNDATION FRAME

GRANULAR LAYER

07 21 13.BD1

COMPRESSED EARTH

UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD

GRANULAR LAYER

0' - 6"

COMPRESSED EARTH

0' - 6"

MIN.

M1 - DOTS - FOUNDATION @ WALL BASE - STEEL FRAME 1

M1 - DOTS - FOUNDATION @ WALL BASE - FOUNDATION WALL 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

MLQ-DOTS-01 METALOQ

FOUNDATION @ WALL BASE - STEEL FRAME

MLQ-DOTS-01 METALOQ

480 Brock Ave. Toronto, ON, M6H 3N3

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D1.04

Project number Date Drawn by Checked by www.skyhookmodular.com

2026-07-30 BI DW

Details OTS

Scale

1 : 10

2026-10-16 1:04:27 PM

M1.D1.04 Foundation @ Wall Base — Steel Frame

M1.D1.02 Foundation @ Wall Base — Foundation Wall

This foundation detail shows a METALOQ module wall base secured to a pre-engineered steel foundation frame with anchor rods.

This foundation detail shows a METALOQ module wall base connected to a concrete foundation wall.

Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D1.04, M1.D1.02, M1.D1.03, 1 : 10, shown reduced. Each sheet carries its own keynote legend; Addendum 1 reproduces every sheet at 100 %.

Keynote Legend

Key Value Keynote Text

06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD

1.C

EXTERIOR ARCHITECTURAL CLADDING

PANEL ON CLIPS

07 46 46 07 46 46.01

SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.

07 21 13

BROKEN CLIP AND Z- GIRT

07 27 00.A1

PLANT NOTE: LEAVE SHEATHING OUT

AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS

PLANT NOTE: LEAVE SHEATHING OUT AT

06 16 10

09 22 16.13

STRUCTURAL CONNECTION POINTS -

09 29 00.B4 06 16 23

SILICONE SEAL OR PRECOMPRESSED FOAM

PATCH ALL EXTERIOR LAYERS

SEAL AT CONCRETE/STILL INTERFACE TO

SILICONE SEAL OR PRECOMPRESSED FOAM

0' - 5 3/8" 0' - 6"

SEAL MEMBRANE LAYERS

SEAL AT CONCRETE/STILL INTERFACE TO

SEAL MEMBRANE LAYERS

TRIM PROFILE AT WALL BASE W/ WEEP

HOLES

STEEL GUSSET PLATE - FILL UNDERSIDE

CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP

WITH GROUT AFTER LEVELLING

CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP

TO ALIGN WITH DRAIN CAVITY

PARGING OR 18 Ga. PREFIN. METAL

ENGINEERED

COVER

PARGING OR 18 Ga. PREFIN. METAL

BY OTHERS

07 26 16.A1

1' - 0"

COVER

07 21 13.BD1

PT PLYWOOD EXTERIOR

SHEATHING

UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD

GRANULAR LAYER

WEEP TILES AROUND FOUNDATION PERIMETER

COMPRESSED EARTH

M1 - DOTS - FOUNDATION @ WALL BASE - SLAB ON GRADE 1

SCALE: 1 : 10 M1.01

Tel: (416)989-4733 SKYHOOK SKYHOOK

FOUNDATION @ WALL BASE - FOUNDATION WALL

MLQ-DOTS-01 METALOQ

FOUNDATION @ WALL BASE - SLAB ON GRADE

480 Brock Ave. Toronto, ON, M6H 3N3

M1.D1.02

Project number Date Drawn by Checked by www.skyhookmodular.com

M1.D1.03

2026-07-30 BI DW

Details OTS

Scale

1 : 10

Scale

1 : 10

2026-10-16 1:04:18 PM

2026-10-16 1:04:23 PM

M1.D1.03 Foundation @ Wall Base — Slab on Grade

This foundation detail shows a METALOQ module wall base at a slab on grade engineered by others, with weep tiles around the foundation perimeter.