Ideas for a modular factory. Julian Bowron, World of Modular Europe, Brussels 2024.
Select a slide to enlarge it.
Scaling Modular Construction
with
DfMAD
Author: Julian Bowron, CTO, METALOQ
Copyright 2024
METALOQ
Kit Frames for Modular Builders * Modular Frame Connection Technology
Autonomous Modular Building Systems * Manufacturing Technology
Governments, humanitarian agencies and the AEC industry are searching for solutions to the multi-million-unit global housing shortage
Despite the huge need, most modular companies produce less than 2,000 modules per annum.
A small number produce 8,000 or more every year.
What are the success factors for high-volume modular production?
Success Stories
A number of companies in NA, the EU and the ME have achieved significant production volumes
Images: Tide Construction, 20,000+ units delivered
Image: DORCE Modular Workforce camp for 25,000 workers
Image: KARMOD Modular Refugee Housing for 17,000 Persons
Image: Spacemaker KSA Workforce Housing for 25,000 Persons (x 2)
Images: VBC
6,000 + apartments, 20+ buildings to date
What are the factors that are limiting the growth of most modular builders?
“10 Great Evils”
….that elevate costs, slow production and reduce volumes
Evil #1: Performative Modular Construction
Is it desirable to make and store enough modules so that an anthill of workers can video the erection of a modular building in 7 days?
Evil #1 cont….
3D printing stylish single-family homes with concrete is cool, but it’s not going to solve the housing crisis
Evil #2: “Go Big or Go Home”
Spending $300 million dollars on a factory “right out of the gate”
…..with payroll, operating costs and debt to match ….
leads to financial pressures,
bad decision making
and dilution of founder’s equity
Evil #3: Unnecessary Complexity
“Mass Customization” results in excessive variants and odd details, leading to increased costs at all stages in the modular building process, from design to supply chain, manufacturing, erection and completion
Evil #1:
Unnecessary Complexity
Evil #4:
Inaccuracy
Sloppy work leads to poor building performance and higher costs at all phases in the manufacturing, assembly and completion process
Evil #5:
Incomplete Detailing
Schematic design followed by resolution of details at the site is expensive and slow
Evil #6: Excess Inventory of WIP and Product
Storing modules waiting for assembly ties up capital, increases handling costs and creates storage costs and risks
Evil #6: Example:
Unitarily-welded module frames create WIP 2x, 1st by increasing TAKT times for frames, and again by creating a production bottleneck…
Completed, but stranded = WIP
Accessible, but arc-on-time limited
Evil #7: Fragile Supply Chains
Extended supply chains are inherently fragile and prevent builders from achieving JIT inventory management
Even local supply chains can be disrupted by payment and contract issues, inadequate inventory, long lead times and “Black Swan Events” (Suez Canal, COVID etc.)
Evil #8: Inefficient Factory Design
Example:
Modules placed end to end, combined with awkward material delivery routing
= extended TAKT times and
less efficient utilization
of space and capital
Evil #9: Too Much Innovation
Do you want to do R&D…..or do you want to complete buildings?
Evil #10:
Fragile Pipeline
The products of some modular builders can’t gain required approvals,
are too expensive to build,
or lack a compelling market advantage,
leading to a fragile
order pipeline
What the 10 Evils have in common is a lack of:
Design
for
Manufacturing Assembly and Distribution
DfMAD
Owners / investors control the financial resources entrepreneurs need to fuel growth. Many investors have been convinced to fund modular startups, only to find profitability elusive.
Product Designers and Plant Managers are tasked with ensuring their products are needed and plants turn a profit.
This necessitates a ruthless focus on relevance and efficiency.
Getting it Right….
Success Factor Categories
Product Design:
Can your product be made quickly, inexpensively and easily with COTS materials and technology?
Supply Chain:
Is it JIT? Or is there excess inventory with high costs?
Standardisation vs. Customisation:
Have your designers eliminated excess module variants?
Factory Design:
Does the plant use capital and space efficiently?
WIP and Factory Logistics:
Are TAKT times and WIP inventory minimized?
Sitework:
Is building assembly and stitching streamlined?
Customer Relationships:
Is product uptake guaranteed?
Modular Manufacturing Metrics
The Modular Building Industry is NOT the automotive industry
Auto plants = 2m+ sm (20m sf) producing 500k+ cars / annum = >$10b
500k / 365 = 1370 cars / day = 1 car / minute
Cars have 30,000+ parts and 4000+ SKU’s
So the line never stops, nothing goes in to a car that hasn’t been thoroughly pre-qualified
2,000 modules / 365 = 5 modules / day = 1 module / 5 hours = A production ratio of 1:300 ratio compared to a car plant!
Modules have ~4,000 parts with ~350 SKU’s
Benchmark Material Costs
Materials to fabricate a 35 sm module with kitchen, WC, windows and doors:
Low spec, non-stackable temp housing = <$10,000
High end, stackable, to Eurocode / IBC = $40,000+
Range: $280 - $1150/ psm based on application
Material costs are internationalized (Impacts of tariffs NIC!)
Materials costs are common to all producers and are not a good means to create a competitive advantage
Benchmark Labour Costs
Hours to produce 1 x 35 sm module = 180-350 hrs = 5-10 hrs / psm
Labour cost = $6 - $40 / hr (Asia vs. Europe)
Cost / labour / 35sm module = $1,050 - $14,000 (!)
Required hours typical = ~240 x 2,000 units = 480,000 hrs / year
480,000 / 2,000 hours = 240 production workers = $7,200 / module
Labour cost and productivity for a mature producer are common to each market so aren’t a good place to look for margin either
Design costs, material costs, JIT supply chains, and factory layouts are highly interrelated…
A complete COTS list with a high level of supply certainty and logistical detail is essential to maintaining smooth production flow……
To achieve this, the parametric model of the product and the corresponding instruction received on the shop floor must align 100%, and data currency must be meticulously maintained
Standardization VS. Customization
Architectural design % of one-off conventional construction = 4% arch. + 1% - 2% eng. = 5% - 6% (up to 10% for feature buildings)
Design as % of modular construction for a one-off project is higher, by the 10 th project, design cost should drop to ~1%
360 modules x 35 sm x $2,000 = $25m project x 5% = $1,250,000 / @ $75 / hr = 16,666 hours @ 2000 hrs / annum = 8 person years !
$1,250,000 / 360 = $3,472 / module (!)
An excess of variants and SKU’s increases time and costs through the entire sales, contract, design, procurement, shop instruction, manufacturing, sitework and commissioning process……
…..and there is no silver-bullet software or robotic workcell that has successfully solved that problem!
Standardization is a means to create margin
What is the impact of the factory layout on the productivity of a
modular plant?
How is scalability achieved?
Let’s examine the issues……
Understanding modular production capacity:
Size of assembly bays and plants
Modules in production:
10m x 4m = 40 sm x 3 = 120sm
Floor area required: 378 sm
378 / 120 = Ratio of ~3:1
A ratio of 2.5:1 is possible if the modules are longer, 2:1 is possible if modules are longer and spacing is tightened
4m
4m
4m
3m
3m
3m
4m
10m
4m
18m
21m
Modules in production = 40 sm x 8 = 320 sm
Assembly area required = 56m x 18m = 1008 sm
Ratio of assembly area to module area = ~ 3: 1
18m
56m
Modules in production = 40 sm x 8 = 320 sm
Assembly area required = 46m x 13m = 598 sm
Ratio of assembly area to module area = <2: 1
NB: Containers don’t do well in either output-per-area and WIP inventory metrics, as vertical to horizontal area ratio is inherently poor and cutting / rework is time-consuming
13m
46m
Dense production configuration @ RCM Modulaire, PQ, Canada
3-level production with “toaster” wall feed @ RCM Modulaire
Product Size / Speed Impact: Bigger modules moving faster increases output >3x
Production time = 5 days x 10 bays = 2 modules x 350 sq ft / 5 days = 700 sf / week
Production time = 3 days x 10 bays = 3.3 modules x 350 sq ft / 5 days = 1,155 sf / week
Production time = 5 days x 10 bays = 2 modules x 700 sq ft / 5 days = 1,400 sf / week
Production time = 3 days x 10 bays = 3.3 modules x 700 sqft / 5 days = 2,310 sf / week
Long module production @ Metric Modular, USA
Short module production @ Aprao, UK
Speed / Movement Impact:
Fast Production on Long lines = Modules have to move more often
Line indexing interval for 2 modules week: 40 hours, 10 bays traversed = 4 hour interval
Line indexing interval for 3.3 modules week: 40 hours, 10 bays, = 2.5 hour interval
Line indexing interval for 2 modules week: 40 hours, 10 bays traversed = 4 hour interval
Line indexing interval for 3.3 modules week: 40 hours, 10 bays, = 2.5 hour interval
More Moves = More production time consumed in movement
Line indexing interval for 3.3 modules week: 40 hours, 10 bays, = 2.5 hour interval
Indexing time = 10 minutes x 2.5 = 32 minutes / shift = 6% of production time
30 bays x 4 day dwell = 7.5 modules / day
Indexing time = 10 minutes x 7.5 = 75 minutes / shift = 15% of production time
Dwell Time Impact: Line cannot move faster than the most time-consuming module
Mixing WC / Kitchen / shaft modules with living room modules = all slow
Separating module lines by complexity speeds production of simpler modules
Time to extract module from line = 20 minutes
Dwell = 4 days = 32 hours = 1% of production time
Static Bays: No module movement during production = Minimal moving time impact BUT a large space impact
Static Line Impact: Note amount of assembly space that cannot be occupied
Methods of module movement are dependent on the factory building and material handling equipment installed
Overhead crane allows “leapfrogging”
Wide bay allows transverse movement
Narrow bay requires longitudinal movement
Methods of movement: SmartHome Lateral rails
Inverted wheels on floor!
Longitudinal movement on surface mount rails
Omnidirectional movement on Air Bearings
Factory_OS
Leapfrogging
Static bay production @ FEWA PAD, ON, CAD
Transporter combined with a shipping gantry allows direct, right-off-the-line shipment of any module at any time
Prework
Prework
Prework
Prework
Prework
Prework
Tool carts, airlines and worker circulation
An ideal assembly line is: fed by sub-factories, dense, short, lateral and quickly produces a wide / long product
Catwalk Above
Inbound Materials
Outbound Modules
ADMIN
Offline production of partitions with upright buffering stands and pre-installed lifting eyes
Pre-cut material cutting, inspection and kitting
Offline sub-factory production of
high-spec commercial pipe strings
Complex plumbing completed in <10% of
Site-built hours
Offline floor and ceiling assembly and finishing
Completed panels rolled in on worktables (single handling) and tilted up
Most wood modular plants move and buffer wall panels vertically and assemble them to make a volume at a later point in the production process
Components are welded together to make a 3D frame, which is then fit out in the plant to make a module.
ISO Containers are sometimes used.
Unitarily welded “chassis“
This approach means that the number of welders that can work simultaneously (human or robotic), is limited.
Completed work is stranded as “Work In Process Inventory” while the rest of the chassis is welded.
Completed, but stranded = WIP
Accessible, but arc-on-time limited
Automated frame production time = length of weld x speed of welding / 4 robots = approx. 4 hours including loading and unloading of fixture
Form impact: Unitary 3D frame production is slow
whether automated or not
Worse still, a unitarily-welded frame creates both a production bottleneck and unnecessarily difficult tasks such as installing drywall overhead
A recent NA press release boasted that the cost of an automated wood modular plant with capacity of 2,000 modules / annum ( 166 / month) was $100m
Cost of $100m in CAPEX / month @6% over 8 years = $1,314,143.02 / month / 166 = $7,916 /CAPEX / module for frame production only (cost does not include OPEX such as maintenance, programming, etc………..)
Comparison: Cost of 240 hours labour for production of a mid-grade module @ $30 / hr = $7,200 / module for 100% of module = YIKES!
Automation actually increased the cost while replacing inexpensive labour with expensive, hard to find, highly-skilled technicians
Cost of Automation Per Module Produced
Bolted components trade expensive welds for fast, inexpensive bolts
Welding of components = more arc-on time / less WIP and can be done with multiple / inexpensive COBOTS
Frame kit production time = length of weld x speed of welding / 42 robots = approx. 6 minutes takt time / frame kit + 6 unskilled labour hours for assembly
4 hours vs. 6 minutes = frame production speed improvement of 40x
Form impact: 1D frame component production with bolted assembly is highly scalable and up to 40x faster than unitary welding
Weld hours = 20
Weld cost = $750
Assembly hours = 6
Assembly cost = <$300
FYI: Welding automation requires full properties of members and welds to be defined in 3D space, together with welding parameters such as position, penetration, etc.
A kit frame ships to modular plants at the highest value density
= lowest cost
Up to 18 frames / 40’ ISO container = <$250 ea. for trans-continental shipping
Screwing and nailing bridges work in the same way to multiply active tools, reducing takt time and WIP compared to one-at-a-time fastening processes (Triad Mfg.)
The optimum sequence of volumetric assembly is critical:
Parts » Volumes » Fitout = creates the Ship-in-a-bottle” effect
Components » Volumes » Fitout = still a “Ship-in-a-Bottle”
Work completed but not moving =
“In Process Inventory”
Components » Panels » Fitout » Volumes = “Panelization”
Multiple processes simultaneously = “Arc-On Time” enhanced
Some plants……good and bad
3D Panelization Factory Planning Existing Building
SBGRPD Jeddah, KSA
2D Panelization Factory Workflow
Modular Factory Layout
in Existing 3-Bay Building
Panels-to-Volumes workflow is not ideal in a parallel-bay plant, as space, time and labour is lost to inter-bay transfers
There are many less parts in a module than a car.
And excess movement eats in to production time.
So….the ideal assembly line is not unnecessarily long.
To increase volume, duplicate side-fed lines and / or establish specialized lines
And consider new geographies!
A multi-line,
(clockwise) configuration provides 3 assembly lines moving at different speeds with JIT delivery directly to the line from on-site sub-plants, which receive materials at one end and feed subassemblies directly to the assembly lines at the other end.
Truck traffic is smooth, material handling is minimized and crossing paths are eliminated.
The concept applied to a US industrial park site with road access on one long side
The sub-factory concept applied to an existing masonry building with a $%#@& floor plan
Summary: Product Design Impacts on Productivity
Module complexity / affects speed of completion
3 days to completion vs. 6 + days = 2 x output
Module quality / affects value of product
$20,000 vs. $70,000 / module = 3.5 x value output
Module completeness / affects value of product
$70,000 vs. $90,000 / module = 1.3 x output
Summary cont….
Number of module variants / affects cost of design
5%-10% vs. <1% of project value = negative Δ $5,000+ / module
Module Size / Affects output psm of factory space /
35 sm vs. 60 sm / module = 2 x output / movement
Structural concept / affects production rate /
70k sm / annum vs. 140k sm / annum = 2x output
Summary cont….
Size of plant / affects capacity
Linear relationship
Material handling methods / affects % wasted time
Range of effects to 3x
Density of product layout / Affects % wasted space
Range of effects to 1.5x
Summary cont….
Effectiveness of automation / affects realized cost savings (loss)
Range of effects from – 2x to +10x (poorly conceived automation can actually be slower and more expensive than a manual operation)
Assembly methods / Affects “arc-on” time, reduces WIP / stranded production / reduces dwell times
Range of effects to 40x
Cashflow heaven exists…..it’s
a factory that runs like this:
Day 1: Material arrives
Day 2: Sub-assemblies produced
Day 3: Module assembled
Day 4: Module completed
Day 5: Module ships
Day 6: Module stacked
Day 7: Invoice submitted
Day 14: Labour paid for
Day 29: Material paid for
To achieve high volumes and retain ownership of your company:
Initiate DfMAD
Achieve modest volumes
Satisfy customers profitably
Refine the product
Perfect the process
Achieve 7 days to invoicing
Add staff and capacity
Repeat
Thank you!
Questions?
This section is an orientation to the METALOQ system. It does not replace project-specific architecture or engineering, and nothing here should be relied on to design a building. Every project needs licensed professionals and the approval of the authorities having jurisdiction. Illustrations are not to scale.