Details off the shelf, by Skyhook.
METALOQ Documentation v1.0, pages 59–67. Select a page to enlarge it.
ADDENDA
detail sheets · test report · structural assessment
• Addendum 1 — Detail sheets (DOTS) — the fifteen standard details that support the Detail Library.
• Addendum 2 — UNB OCRC test report — the test program that supports the clamp connection capacities.
• Addendum 3 — Ten-storey structural calculation — the FEA and code check that support the ten-storey building.
DETAILS OFF THE SHELF
This addendum contains the fifteen standard details that are summarized in the Detail Library in Chapter 4, reproduced as the original drawing sheets. Each sheet is reproduced at 100%, so the 1:10 scale is correct when this manual is printed at actual size on 11 × 17. The sheets follow the same order as Chapter 4: roof matelines, stacked floor and corridor matelines, and the six foundation-to-wall-base conditions.
ROW 1 · ROOF MATELINES
M1.D2.01 Roof Mateline — FRR Wall Ch 4 60
M1.D2.02 Roof Parapet Ch 4 61
M1.D2.03 Roof Mateline — Interior Wall Ch 4 61
ROW 2 · STACKED FLOOR MATELINES
M1.D2.08 Stacked Floor Mateline — FRR Wall Ch 4 62
M1.D2.07 Exterior Wall Stack Mateline Ch 4 62
M1.D2.09 Stacked Floor Mateline — Interior Wall Ch 4 63
ROW 3 · CORRIDOR MATELINES
M1.D2.04 Corridor Mateline — Roof Level Ch 4 63
M1.D2.05 Corridor Mateline — Typ. at Unit Entrance Ch 4 64
M1.D2.06 Corridor Mateline — Typ. at Shaft Locations Ch 4 64
ROW 4 · FOUNDATION ⁄ WALL BASE I
M1.D1.01 Foundation @ Wall Base — Concrete Basement Ch 4 65
M1.D1.06 Foundation @ Wall Base — Steel Podium Ch 4 65
M1.D1.05 Foundation @ Wall Base — Steel Pile Ch 4 66
ROW 5 · FOUNDATION ⁄ WALL BASE II
M1.D1.04 Foundation @ Wall Base — Steel Frame Ch 4 66
M1.D1.02 Foundation @ Wall Base — Foundation Wall Ch 4 67
M1.D1.03 Foundation @ Wall Base — Slab on Grade Ch 4 67
Source: Skyhook Modular Architecture — METALOQ “Details OTS”, project MLQ-DOTS-01, sheets M1.D1.01–06 and M1.D2.01–09, 1 : 10.
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A4 5/8" GYPSUM WALLBOARD 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
WRAP ROOF MEMBRANE OVER PARAPET ON SITE - COMPLETE WITH PREFIN. METAL
COPING CLIPPED OVER MODULAR CLEATS
MODULAR PARAPET COMPLETE WITH STUD
WALL, INSULATION AND TYPE X GWB FOR
FIRE SEPARATION CONTINUATION
BOLT CFS CHANNELS AT OPENINGS, WRAP AVB OVER CHANNELS - APPLY SEALANT ON
AVB BEFORE NEXT MODULE SETTING
MODULAR FLAT ROOF ASSEMBLY: RIGID INSULATION BASE AND TAPERED LAYER
COMPLETE WITH ROOF MEMBRANE
BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -
1' - 6"
REMOVE AFTER SETTING
07 50 00
07 27 00.A1
06 16 10
09 29 00.A4
09 22 13.23
09 29 00.B4 09 22 16.13
ULC W484
10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
0' - 1" MIN.
TO EQUAL FIRE RATING AFTER SETTING
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:44 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 21 13 BOARD INSULATION 07 21 13.BD5 EXTRUDED POLYSTYRENE (XPS) BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A4 5/8" GYPSUM WALLBOARD 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD 1.B
FLAT ROOF FASTENER WITH
STRESS PLATE
PREFIN. METAL COPING
CLIPPED OVER CLEATS
EXTERIOR ARCHITECTURAL
CLADDING PANEL ON CLIPS
SEMI-RIGID CONTINUOUS
1' - 6"
INSULATION BOARD
07 50 00
10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE /
07 21 13.BD5
CAULK TO EQUAL FIRE RATING AFTER SETTING
07 27 00.A1
06 16 10
CONTINUOUS AIR-VAPOR BARRIER AROUND RIM BEAM
PT PLYWOOD EXTERIOR
SHEATHING
09 29 00.A4
09 22 13.23
06 16 10 09 22 16.13 09 29 00.B4
07 46 46 07 46 46.01 07 21 13 07 27 00.A1
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:50 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 21 13.BD5 EXTRUDED POLYSTYRENE (XPS) BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
FLAT ROOF FASTENER WITH
STRESS PLATE
SITE APPLIED ROOF MEMBRANE
OVER MATELINE GAP
SITE FILL MATELINE GAP WITH SPRAY FOAM OR FOAM BOARD
MODULAR FLAT ROOF ASSEMBLY:
RIGID INSULATION BASE AND TAPERED LAYER COMPLETE WITH
1' - 6"
ROOF MEMBRANE
2" - 4"
BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -
REMOVE AFTER SETTING
07 50 00
07 21 13.BD5
07 27 00.A1
06 16 10
09 29 00.B4 09 22 13.23
FIRE CAULK / TAPE AT MATELINE IF RATED
SITE BUILT GWB ON MODULAR WALL
MODULAR INCOMPLETE STUD WALL COMPLETE WITH CFS STUDS AND GWB
10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
TO EQUAL FIRE RATING AFTER SETTING
0' - 1"
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:59 PM
06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
1" MIN. 1HR FRR AS PER UL U493
DAGGER CONNECTION BETWEEN STACKED MODULES
09 29 00.B4 09 22 16.13 06 16 23
09 29 00.B4
09 22 13.23 09 22 16.13
10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK TO EQUAL
FIRE RATING AFTER SETTING
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:12 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
07 46 46.01 07 46 46
07 21 13
06 16 23
06 16 10
METAL THRU-WALL FLASHING - MIN.
24 Ga. - EXTEND TO COUNTERSUNK FASTENER LINE - CLIP ON CLADDING
CLADDING BASE TRIM - ALLOW
DRAINAGE
PRE-COMPRESSED FOAM OR SILICONE SEALANT - OVER WEB
SIDE OF THE RIM JOIST
WRAP AVB OVER MODULE CORNERS - TERMINATE WITH TAPE
09 29 00.B4
OVER
09 22 13.23 10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
09 22 16.13
TO EQUAL FIRE RATING AFTER SETTING
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:02 PM
06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.A3 1/2" GYPSUM WALLBOARD 09 29 00.A4 5/8" GYPSUM WALLBOARD
09 22 16.13 09 29 00.A3
06 16 23 FLOOR JOINT TRIM
09 29 00.A4 09 22 13.23
FIRE CAULK / TAPE AT MATELINE IF RATED
SITE BUILT GWB ON MODULAR WALL
MODULAR INCOMPLETE STUD WALL COMPLETE WITH CFS STUDS AND GWB
10" x 10" CEILING PANEL AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
TO EQUAL FIRE RATING AFTER SETTING
0' - 1 1/2"
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:23 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 50 00 MEMBRANE ROOFING 09 22 13.23 RESILIENT CHANNEL FURRING 09 29 00.A4 5/8" GYPSUM WALLBOARD
FLAT ROOF FASTENER WITH
STRESS PLATE
SITE APPLIED ROOF MEMBRANE
OVER MATELINE GAP
MODULAR FLAT ROOF ASSEMBLY:
RIGID INSULATION BASE AND TAPERED LAYER COMPLETE WITH
1' - 6"
ROOF MEMBRANE
SITE FILL MATELINE GAP WITH SPRAY FOAM OR FOAM BOARD
2" - 4"
BLADE CONNECTION FOR LIFT UP HOOKS AT POINT LOAD LOCATIONS -
REMOVE AFTER SETTING
07 50 00
07 27 00.A1
06 16 10
09 29 00.A4
09 22 13.23
SITE BUILT TYPE X GWB AND RESILIENT
CHANNEL ON MODULAR STUDS
FRR STUD WALL - WITH PIPE SHAFT
WHERE INDICATED ON PLAN
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:00 PM
06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 08 71 00.18 WEATHERSTRIPPING, THRESHOLDS AND SEALS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
0' - 5 1/4" 0' - 9 17/32"
STEEL FLUSH UNIT ENTRANCE
DOOR ON HM FRAME
08 71 00.18
UNIT ENTRANCE ALCOVE - WRAP
FRR TYPE X GWB AROUND
06 16 23
FLOOR JOINT TRIM
UNIT SIDE CORRIDOR SIDE
1' - 7 5/8"
1' - 8 1/4"
09 29 00.B4
BULKHEAD OVER STIFFENER PLATES -
KEEP FRR ASSSEMBLY CONTINUOUS
09 22 16.13 09 22 13.23
FIRE CAULK / TAPE AT CORNERS
FRR STUD WALL - WITH PIPE SHAFT
WHERE INDICATED ON PLAN
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:01 PM
06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
1' - 2"
09 29 00.B4 09 22 16.13 RESILIENT CHANNEL AND TYPE X GWB
ON CORRIDOR SIDE ARE APPLIED ON
SITE - TIGHTLY FILL WITH BATTING AFTER CONNECTIONS ARE COMPLETE UNIT SIDE CORRIDOR SIDE
06 16 23
1' - 7 5/8"
BULKHEAD OVER STIFFENER PLATES -
KEEP FRR ASSSEMBLY CONTINUOUS
09 29 00.B4
09 22 16.13 09 22 13.23
FIRE CAULK / TAPE AT CORNERS
FRR STUD WALL - WITH PIPE SHAFT
WHERE INDICATED ON PLAN
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:05:02 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
STR. CONNECTION ACCESS OPTIONS: AP#1 - THROUGH EXTERIOR SHEATHING AP#2 - THROUGH INTERIOR CEILING
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
BROKEN CLIP AND Z- GIRT 07 46 46 07 46 46.01
AP#1: LEAVE SHEATHING OUT AT STRUCTURAL CONNECTION POINTS -
07 21 13
PATCH ALL EXTERIOR LAYERS 06 16 10
07 27 00.A1
AP#2: CEILING GAP AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
09 22 16.13
09 29 00.B4 06 16 23
TO EQUAL FIRE RATING
2 LYRS TYPE X 5/8" GWB ON RES. CHANNEL WITH ABSORPTIVE
09 22 13.23
0' - 11 3/8" 0' - 1 3/4"
MATERIAL IN CAVITY
09 29 00.B4
SILICONE SEAL OR PRECOMPRESSED FOAM
SEAL AT CONCRETE/STILL INTERFACE TO
SEAL MEMBRANE LAYERS
ANCHOR BOLT CONNECTION - GUSSET
PLATES HAVE TO BE LEVELED
MODULE WALL BASE TRIM (24 Ga) TO BE
BENT OVER SILL BLOCK - SEAL UNDER
FLASHING
SITE BUILT BASEMENT WALL - GUSSET PLATE ON SET ANCHORS -
FILL WITH GROUT BELOW
MEP BULKHEAD - 1/2" GWB BUILT ON
0' - 6"
2" FURRING PROFILES - BRACED
MIN.
OPTIONAL: BRICK VENEER AND TIE ANCHORING ASSEMBLY - SITE BUILT
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:13 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 13.23 RESILIENT CHANNEL FURRING 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
STR. CONNECTION ACCESS OPTIONS: AP#1 - THROUGH EXTERIOR SHEATHING AP#2 - THROUGH INTERIOR CEILING
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
07 46 46 07 46 46.01
BROKEN CLIP AND Z- GIRT
07 21 13
AP#1: LEAVE SHEATHING OUT AT STRUCTURAL CONNECTION POINTS -
06 16 10
07 27 00.A1 09 22 16.13
PATCH ALL EXTERIOR LAYERS
AP#2: CEILING GAP AT CONNECTION POINTS - PATCH AND FIRE TAPE / CAULK
09 29 00.B4 06 16 23
TO EQUAL FIRE RATING
SEAL AVB TRANSITION WITH TAPE 09 22 13.23
09 29 00.B4
MODULE WALL BASE TRIM (24 Ga) TO BE
1' - 1 1/8" 1' - 1 1/8"
BENT OVER SILL BLOCK - SEAL UNDER
FLASHING
SITE BUILT STEEL PODIUM FRAMING - WRAP WITH 2 LYRS.
TYPE X GWB FROM INSIDE
OPTIONAL: BRICK VENEER AND TIE ANCHORING ASSEMBLY - SITE BUILT
MEP BULKHEAD - 1/2" GWB BUILT ON
2" FURRING PROFILES - BRACED
AS PER BEAM SIZE AND DAGGER SLIP LOCATION
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:36 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
EXTERIOR ARCHITECTURAL CLADDING
07 46 46 07 46 46.01
PANEL ON CLIPS
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
07 21 13
07 27 00.A1
BROKEN CLIP AND Z- GIRT PLANT NOTE: LEAVE SHEATHING OUT
06 16 10
09 22 16.13
AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS
09 29 00.B4 06 16 23
SILICONE SEAL OR PRECOMPRESSED FOAM
0' - 5 3/8" 0' - 6"
SEAL AT CONCRETE/STILL INTERFACE TO
SEAL MEMBRANE LAYERS
ANCHOR BOLT CONNECTION - GRADE
BEAMS HAVE TO BE LEVELED
GRADE BEAM POURED ON SCREW PILES
PARGING OR 18 Ga. PREFIN. METAL
COVER
GUSSET PLATE WITH PRE- BOLTED STEEL ANCHORS - SET
07 26 16.A1
IN BEAM AFTER POUR 07 21 13.BD1
1' - 1"
UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD
GRANULAR LAYER
COMPRESSED EARTH
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:31 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
07 46 46 07 46 46.01
EXTERIOR ARCHITECTURAL CLADDING
PANEL ON CLIPS
07 21 13
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
07 27 00.A1
06 16 10
BROKEN CLIP AND Z- GIRT
09 22 16.13
PLANT NOTE: LEAVE SHEATHING OUT
09 29 00.B4 06 16 23
AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS
0' - 5 3/8" 0' - 6"
SEAL AVB TRANSITION WITH TAPE
PT PLYWOOD BLOCKING - SITE WORK
CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP
TO ALIGN WITH DRAIN CAVITY
PARGING OR 18 Ga. PREFIN. METAL
0' - 7 1/4" 0' - 6"
COVER
07 26 16.A1
1' - 0"
PRE-ENG. FOUNDATION ANCHOR RODS TO SECURE STEEL FOUNDATION FRAME
07 21 13.BD1
UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD
GRANULAR LAYER
COMPRESSED EARTH
0' - 6"
MIN.
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:27 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
EXTERIOR ARCHITECTURAL CLADDING
PANEL ON CLIPS
07 46 46 07 46 46.01
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
07 21 13
07 27 00.A1
BROKEN CLIP AND Z- GIRT
06 16 10
09 22 16.13
PLANT NOTE: LEAVE SHEATHING OUT AT
09 29 00.B4 06 16 23
STRUCTURAL CONNECTION POINTS -
PATCH ALL EXTERIOR LAYERS
0' - 5 3/8" 0' - 6"
SILICONE SEAL OR PRECOMPRESSED FOAM
SEAL AT CONCRETE/STILL INTERFACE TO
SEAL MEMBRANE LAYERS
STEEL GUSSET PLATE - FILL UNDERSIDE
WITH GROUT AFTER LEVELLING
CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP
07 21 13.BD1
TO ALIGN WITH DRAIN CAVITY
0' - 6"
PARGING OR 18 Ga. PREFIN. METAL
GRANULAR LAYER
1' - 0"
COVER
COMPRESSED EARTH
UNDERGROUND MOISTURE BARRIER OR DRAINAGE BOARD
0' - 6"
MIN.
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:18 PM
06 16 10 PLYWOOD ROOF AND WALL SHEATHING (CD-X) 06 16 23 SUBFLOORING (MIN. 3/4" PLYWOOD, CEMENT BOARD OR 7/8" MAGNESIUM OXIDE BOARD) 07 21 13 BOARD INSULATION 07 21 13.BD1 FOUNDATION AND NON-LOAD BEARING UNDERSLAB INSULATION 07 26 16.A1 UNDER-SLAB VAPOR BARRIER 07 27 00.A1 VAPOUR-IMPERMEABLE SELF-ADHERING MEMBRANE 07 46 46 FIBER-CEMENT SIDING 07 46 46.01 CLADDING SUPPORT SYSTEMS 09 22 16.13 NON-STRUCTURAL METAL STUD FRAMING 09 29 00.B4 5/8" TYPE X GYPSUM WALLBOARD
EXTERIOR ARCHITECTURAL CLADDING
PANEL ON CLIPS
07 46 46 07 46 46.01
SEMI-RIGID CONTINUOUS INSULATION BOARD W/ THERM.
BROKEN CLIP AND Z- GIRT
07 21 13
07 27 00.A1
PLANT NOTE: LEAVE SHEATHING OUT
AT STRUCTURAL CONNECTION POINTS - PATCH ALL EXTERIOR LAYERS
06 16 10
09 22 16.13
09 29 00.B4 06 16 23
SILICONE SEAL OR PRECOMPRESSED FOAM
SEAL AT CONCRETE/STILL INTERFACE TO
0' - 5 3/8" 0' - 6"
SEAL MEMBRANE LAYERS
TRIM PROFILE AT WALL BASE W/ WEEP
HOLES
CLOSE CONNECTION ACCESS GAP ON SITE WITH RIGID BOARD INSULATION - BUILD UP
TO ALIGN WITH DRAIN CAVITY
PARGING OR 18 Ga. PREFIN. METAL
ENGINEERED
07 26 16.A1
COVER
BY OTHERS
07 21 13.BD1
PT PLYWOOD EXTERIOR
SHEATHING
GRANULAR LAYER
WEEP TILES AROUND FOUNDATION PERIMETER
COMPRESSED EARTH
SCALE: 1 : 10 M1.01
480 Brock Ave. Toronto, ON, M6H 3N3
Project number Date Drawn by Checked by www.skyhookmodular.com
2026-07-30 BI DW
Scale
1 : 10
2026-10-16 1:04:23 PM
This section is an orientation to the METALOQ system. It does not replace project-specific architecture or engineering, and nothing here should be relied on to design a building. Every project needs licensed professionals and the approval of the authorities having jurisdiction. Illustrations are not to scale.