3D model of a METALOQ module frame
Documentation

Components

What each part is and what it does.

In brief
An exploded module frame with each component labelled
Navy parts are the brake-formed structural frame. Bright steel parts are roll-formed light-gauge steel.

Columns

The column is a laser-cut, brake-formed steel section with welded end plates that connect one module to the next. There are three kinds:

  • Corner column, at each module corner.
  • Intermediate column, at mid-span on the long sides, running the full module height.
  • Strut column, placed where needed between the floor and ceiling beams.
A corner column shown in place and on its own

Rim beams

Eight rim beams form the module’s perimeter: a floor ring and a ceiling ring, each with two side beams and two end beams. They carry the floor diaphragm loads to the columns.

A module with its eight rim beams highlighted and other members ghosted

Floor and ceiling joists

Floor and ceiling joists share the same connection details, so one connection serves the whole joist array. Depths of 6, 8, 10 and 12 inches are the most common, chosen by the project engineer.

Floor and ceiling joists shown in a frame and as individual parts

Clamp connection

The clamp connection is the main load path between the joists and the rim beams. It joins them without welding to, or bolting through, the joist web, and it restrains the joist end so the floor acts as a diaphragm. Its performance was characterized in a test program at UNB OCRC.

The clamp connection between a joist and a rim beam, assembled and exploded

Crossbrace

The crossbrace is a diagonal member that connects to plates on the rim beams and braces the frame against racking. The brace type is selected for each building.

Dogbone

The dogbone is a tapered plate that sits in a recessed pocket in the top of each column. Its tapered edges pull adjacent modules together horizontally and carry shear between them.

A dogbone plate seated across the tops of adjacent columns

Dagger

The dagger is a tapered pin that aligns stacked modules and ties them together vertically. One component does four jobs on site:

  • Hoisting. The module is lifted by daggers, which are removed afterwards.
  • Permanent joint. A dagger under the incoming module engages the module below and is bolted in place.
  • Alignment. As a module is lowered, the taper guides it into position.
  • Foundation connection. The same part connects the ground-floor module to the foundation.
Daggers connecting stacked modules, and two daggers shown on their own

Corridor connectors

Six machined components sit at the module corners, where the corridor frame is supported and where the lowest module meets the foundation.

Six corridor connector types shown in place

Chapter 3 in full

METALOQ Documentation v1.0, pages 23–38. Select a page to enlarge it.

3 Components

3 Components, page 23
Page 23Enlarge
Read page 23 as text

RIM CEILING BEAM CEILING JOIST CLAMP DOGBONE RIM CEILING BEAM END DAGGER

COLUMN CROSSBRACE FLOOR JOIST STRUT COLUMN INT. COLUMN RIM BEAM

CHAPTER

Components

This chapter provides engineering data for every METALOQ component. The facing page shows the full kit for one module, with the frame exploded.

Colour coding is used throughout the manual:

• navy components are the brake-formed structural frame,

• bright steel components are roll-formed light-gauge steel, and

• bronze is used to highlight the specific component being discussed.

§ Component Family SSOT tag

What it does

3.1 Corner column CLM-CHN The vertical member at each corner is the primary component that supports gravity loads, including loads that accumulate over many storeys.

The intermediate column sits along the long sides, at mid-span or offset to suit the layout. It is the same height as the corner column, with beam connectors on either side.

3.2 Intermediate column CLM-0001

3.3 Strut column CLM-0002 The strut column is a mid-span column that bears on the rim beams through web stiffeners in the beams.

3.4 Rim beams RMJ · RJP The perimeter beams include the two side beams and two end beams at both the floor and the ceiling.

3.5 Floor & ceiling joists JST The LGS joists form an array spanning between rim beams in order to carry the floor and ceiling.

3.6 Clamp connection LCL · LCU The joist-to-rim-beam connection transfers diaphragm and torsional loads to the structure.

3.6 Floor deck — The floor deck turns the joist array into a diaphragm, using an approved screw and spacing.

3.7 Crossbrace BRC The crossbrace is the diagonal member in a column bay. It triangulates the frame against in-plane racking.

3.8 Dogbone TLC-2WY · -4WY The dogbone is the flat tie plate between the column top end plates of adjacent modules.

3.9 Dagger LCP-HST The dagger is the vertical locating pin between stacked modules. It carries tension and serves as the hoist point during placement.

3.10 Corridor connectors TLC-COR The corridor connectors are six specialty corner components that provide corridor support, special ties, and a foundation box.

3.1 Column

3.1.1 Corner-column variants — ULS capacity

3.1 Column, page 24
Page 24Enlarge
Read page 24 as text

3 . 1 Column

The METALOQ column is a CFS laser-cut and brake-formed U-section, with welded plates used for stiffening and to form top and bottom end plate assemblies for connections between modules. The dagger and the dogbone connectors both attach at the plate assemblies. The top end plate itself is a thicker plate with a CNC-machined recessed pocket to accept a dogbone tie; the bottom end plate is solid.

Three types of columns are deployed to solve different structural needs at the corners, mid-span, and other locations:

• the corner column (shown on the facing page) is located at each module corner;

• the intermediate column is located at mid-span of the long sides; and

• the strut column is located where needed.

The corner and intermediate columns extend the full module height and have supports to attach the rim beams on shear channels. The strut column bears on the rim beams.

Corner-column variants — ULS capacity

The 100 × 300 corner column has four section variants, each listed below in order of increasing compressive capacity. Extra capacity is generated by increasing the wall thickness, adding a welded rib and bending a lip.

The standard off-the-shelf column is highlighted in amber. The others are customized to suit the engineer’s needs.

Corner Column 100 × 300 — no rib (standard)

Yield Fy (MPa)

Thickness

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type

Criterion

t (mm)

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 6 60 255 325 160 M20 Initiation of yielding

350 8 89 400 435 160 M20 Initiation of yielding

350 10 112 500 529 160 M20 Initiation of yielding

Corner Column 100 × 300 — with rib

Yield Fy (MPa)

Thickness

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type

Criterion

t (mm)

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 6 70 300 440 160 M20 Initiation of yielding

350 8 93 400 570 160 M20 Initiation of yielding

350 10 117 500 700 160 M20 Initiation of yielding

Corner Column 100 × 300 — with lip

Yield Fy (MPa)

Thickness

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type

Criterion

t (mm)

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 6 98 300 669 160 M20 Initiation of yielding

Corner Column 100 × 300 — with rib and lip

Yield Fy (MPa)

Thickness

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type

Criterion

t (mm)

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 6 98 300 745 160 M20 Initiation of yielding

3.2 Intermediate Column

3.2.1 Modes of Variability

3.2.2 Material Specification

3.2 Intermediate Column, page 25
Page 25Enlarge
Read page 25 as text

3 . 2 Intermediate Column

The intermediate column is typically located on the long side (in the middle or offset) and extends the full module height with top and bottom end plate assemblies. It is spliced into the rim beams at the top and bottom by four shear channels, two at the floor and two at the ceiling. The column transfers axial load down through the stack of intermediate columns.

Modes of Variability

Common to all three column types unless noted.

Length 2.6 m – 3.6 m in 50 mm increments

Wall thickness 3 mm, 4.5 mm, 6 mm (std), 8 mm

Lips None (std), 10 mm, 15 mm

Anti-buckling rib None (std) or central

Cross section 4×4 (std intermediate), 4×6, 4×8, 4×10, 4×12 (std corner)

Lateral pair Two columns tied → 4×24 supercolumn

Concrete fill Optional (Lally column)

Plate thickness ⅜″ std, ½″ optional

Material Specification

• Cold-formed open section, laser-cut and brake-formed from steel coil

• Fy = 350 MPa / 51 ksi (min.), Fu = 450 MPa / 65 ksi (min.) – CSA G40.21 350W, or ASTM A1011 SS Grade 50 (Fy = 345 MPa / 50 ksi) for US coil

• Hot-dip galvanized to ASTM A123, 85 µm min. coating

• Mill test report retained per §7.2 QA/QC plan

ON THE §3.1 ULS TABLES

The four tables are the corner column's modes of variability in order of increasing compressive capacity: no rib → central rib → lip → rib and lip. Only the 6 mm wall has been run for the two lipped variants; 8 mm and 10 mm are pending.

Tensile capacity is 160 kN in every variant with the standard single M20 bolt. It is governed by the bolted connection, not by the column section, so neither the rib nor the lip changes it; a larger or second bolt raises it (see §2.6, finding 5).

All values are first-yield (initiation of yielding), not ultimate. Moment capacities are strong-axis only; moment and shear are pure values and are not concurrent.

§3.1 FEA von-Mises contour set — render pending.

3.3 Strut Column

3.3.1 Bearing Wall / Bearing Stack

3.3.2 The three types compared

3.3.3 Sections through the three column types

3.3 Strut Column, page 26
Page 26Enlarge
Read page 26 as text

3 . 3 Strut Column

The strut column sits anywhere along a rim beam that is not to be spliced. It is the one column that does not run the full module height. It bears on the top of the rim floor beam and extends up to the underside of the rim ceiling beam. Gravity load passes into it from the ceiling beam above, through web stiffeners in that beam, and down into the floor beam below. Where it is used temporarily, it can be removed on site once the permanent load path is made.

Because the strut column bears directly on the rim beams, it uses simple ¼″ top and bottom end plates. To ensure the load bears correctly, a separate shim sits on top of the ceiling beam to pack the gap between rim beams.

Bearing Wall / Bearing Stack

Multiple intermediate columns can be stacked to form a bearing wall, which can then be fire-rated as one continuous wall element rather than as individual primary structural supports.

The three types compared

CORNER INTERMEDIATE STRUT

Where Module corner Mid-span, long side As needed

Typical per module 4 2 As needed

Section 4 × 12 4 × 4 4 × 4

Runs Full height Full height Beam to beam

Shear channels Yes 4 (2 upper, 2 lower) None

Top / bottom end plates

Top ≠ bottom ⅜″ btm / 1.25″ top ¼″, same both ends

Parts 11 15 8

Acts as Gravity column Splice Bearing strut

Sections through the three column types

12″ / 300 mm

4″ / 100 mm

Optional rib — thickness as required

Optional bent lip — ⅝″ / 16 mm

Fig. 3.3 — plan section through each column type at one scale, cut at the strut’s mid-height: corner (4 × 12), intermediate and strut (4 × 4), left to right.

3.4 Rim Beams

3.4 Rim Beams, page 27
Page 27Enlarge
Read page 27 as text

Max 26′ (7.9 m) Max 26′ (7.9 m)

§3.4 · RIM BEAMS

Perimeter beams at the floor and ceiling

All other members are ghosted to show the eight rim beams: a ceiling ring and a floor ring, each framed by two side beams (left and right, on the long faces) and two end beams (front and back, on the short faces).

Page 28, page 28
Page 28Enlarge
Read page 28 as text

Rim Beams — Engineering

The module’s perimeter consists of eight rim beams: a floor ring and a ceiling ring, each with two side beams (left and right, on the long faces) and two end beams (front and back, on the short faces). The standard rim beam sizes are 3″ × 10.5″ / 75 × 265 mm for the floor beam and 3″ × 6.5″ / 75 × 165 mm for the ceiling beam, both with a ¼″ / 6 mm wall. Either beam can be increased in size for structural reasons. The rim beams carry the module diaphragm loads to the columns and plate assemblies.

Side beams — left & right

• Bolted at each end to shear channels welded to the column.

• A laser-cut hand hole gives access to the rim beam bolts that connect the upper and lower beams, where required.

• Side rim beams are slotted to receive the joist shear tabs, which are welded to the outside face of the flange.

• Modes of Variability: length, depth, wall thickness, span and intermediate column position, and clamped-joist spacing.

• Maximum Span Between Columns: 26′-0″ / 7.9 m with non-load-bearing infill (see the design rule below).

End beams — front & back

The end beams close the two short ends of the module. They are detailed in the same way as the side beams, except that no shear tab slots are required.

• Façade-Panel Mounting: The end beams are prepared for the “French Cleat Plates” (to be described in a forthcoming edition).

• Modes of Variability: The same as for the side beams.

• FEA, Material Specification, and ULS for Span: The same as for the side beams.

ULS Member Resistances

Element Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Governing Failure Mode

Mr (kN·m)

Vr (kN)

(kN)

Upper Rim Joist Tab 9 121 – – Bolted connection (4x 1/2" dia. bolts)

Lower Rim Joist Tab 16.1 121 – – Bolted connection (4x 1/2" dia. bolts)

Shear Tab — Floor Joist 1.45 25 15 20 Tab section / fastener

Shear Tab — Roof Joist 0.8 15 6.7 9 Tab section / fastener

* Upper/Lower Rim Joist Tab moment and shear capacities are governed by the bolted connection (1/2" dia. Grade 5 / A325 bolts), not the gross tab section.

Moment capacities are about the strong axis only. Shear capacity assumes 1/2" dia. Grade 5 or A325 bolts.

Moment and shear capacities shown are pure moment and pure shear resistances. They are not concurrent (that is, not a combined load case).

DESIGN RULE Max span between columns — 26′-0″ / 7.9 m

A rim beam may span up to 26′-0″ / 7.9 m between columns provided the infill walls are not load-bearing. For a longer span, an intermediate column is required. The limit is calculated on the basis that the infill studs carry no transport or hoisting load. The transport and hoisting cases are therefore included in the limit and do not require a separate check.

Page 29, page 29
Page 29Enlarge
Read page 29 as text

§3.4 · RIM BEAMS — THE OVERLAP

Rim Beam Connectors

Rim beams are shown connected and exploded, with stiffener plates at struts, shear tabs along the side beam, and brace plates where bracing connects.

3.5 Floor and Ceiling Joist

3.5 Floor and Ceiling Joist, page 30
Page 30Enlarge
Read page 30 as text

3 . 5 Floor and Ceiling Joist

Floor and ceiling joists are designed with the same dimple and clamp details, so one connection serves the whole joist array, floor and ceiling alike. Joist size is determined by the project engineer, taking into account the span, the load, MEP circulation, and the desired stiffness. Joist depths typically vary in 2″ increments. Depths of 6″, 8″, 10″, and 12″ are the most common for floors and ceilings. See Clamp Connection on the following page for the clamp connection details.

3.6 Clamp Connection

3.6.1 Why the shear tab passes through the beam

3.6.2 Tested Capacity

3.6 Clamp Connection, page 31
Page 31Enlarge
Read page 31 as text

Weld the two tangs on the far side of the web

3 . 6 Clamp Connection

The clamp connection is the primary load path between the joists and the rim beams in a METALOQ module. It connects the floor and ceiling joists to the rim beams without welding to, or bolting through, the joist web. Production methods and performance are characterized in the UNB OCRC test report (see Addendum 2).

Why the shear tab passes through the beam

A joist that only bears on the rim beam forms a pinned connection. Each shear tab is welded to the rim beam instead, restraining the joist end against rotation so the connection resists moment as well as shear, which increases the capacity of the joist itself. The joists carry more than gravity load: the applied deck over them turns the joist array into a diaphragm (see Floor Deck, following page), so the deck’s in-plane load reaches the rim beams through this same connection.

The edge of a thin web cannot be welded reliably at right angles to another thin web, so the rim-beam web is slotted. Each tab passes through as two tangs, and the weld runs along them on the far, outward-facing side, where there is both access and a plate edge to weld to. This detail is designed to prevent fit-up errors: the tab seats only one way, a fitter can confirm both tangs are through before starting the weld, and once through the slots the tab cannot pull back out, even if the weld itself is substandard. The dimpled joist and the stamped clamping plate carry the joist load into the tab, and from there into the rim beam. The tabs are welded to the rim beams before delivery, so no welding is required at the plant where modules are assembled.

Tested Capacity

LOADING TESTED CAPACITY * GOVERNING LIMIT

Tension 54 kN Plate yield

Compression 62 kN Bearing

Shear — X 38 kN Weld line

Shear — Y 44 kN Bolt bearing

* Values are from the UNB OCRC test program, March 2021. The full test report is bound in as Addendum 2. This is the only METALOQ resistance table backed by the UNB program. These are tested capacities, not factored resistances: ULS design applies further reductions. Shear-tab FEA (Ansys, 14 Jan 2025).

Model setup — displacement (A), applied moment 1.45 × 106 N·mm (B), fixed support (C).

Equivalent (von-Mises) stress — peak 412 MPa at the tab; web probes read 192 to 282 MPa.

3.6.3 Floor Deck

3.6.3 Floor Deck, page 32
Page 32Enlarge
Read page 32 as text

FLOOR STIFFNESS — DEFLECTION LIMITS

DEFLECTION LIMIT FLOOR FEEL METALOQ USE

L/300 Perceptibly springy Code minimum

L/360 Cost-effective METALOQ minimum standard

L/480 Better stiffness Upgrade

L/720 Stiff, at increased cost Minimum under tile

Maximum floor deflection as a fraction of joist span (L). The code minimum in Ontario is L/300 under total load and L/360 under live load. METALOQ specifies L/360 as its minimum everywhere, and L/720 where the floor is tiled.

4′ × 8′ staggered floor deck

Diaphragm Capacity: 411 plf (6 kN/m)

Floor Deck

The plan below shows the floor deck of one module, with the frame and floor joists ghosted beneath it. The deck spans the joists and makes the floor act as a diaphragm. The arrows below the plan show the in-plane capacity along the long edge of the deck, which is transferred to the dogbone ties.

Panelization: The deck uses 4′ × 8′ sheets, with the 8′ dimension along the module length. Three 4′ rows cover the 12′ width, and the end joints are staggered by 2′ from row to row. The deck is held ⅛″ clear of the rim beam on every side, so the 12′-0¼″ opening takes exactly three 4′ rows. Floor joists are spaced at 24″ on centre, so an 8′-0″ sheet spans exactly four joist bays and every end joint is supported on a joist flange. 16″ joist spacing can also be used.

Bridging: An LGS strap runs along the underside of the floor joists to restrain them against rotation and lateral buckling.

DESIGN RULE Diaphragm capacity is not a constant — it must be calculated per module

The 411 plf (6 kN/m) shown is a typical value for the standard size modules. The actual value will depend on materials and dimensions used for an actual building.

3.7 Crossbrace

3.7.1 Capacity

3.7 Crossbrace, page 33
Page 33Enlarge
Read page 33 as text

A · CONVENTIONAL STRAP WALL

B · LIMITED-DUCTILITY STRAP WALL

Flat straps on small-diameter bolts; every component designed to CSA S136 (AISI S400 E7); wall h:w ≤ 2:1; straps pretensioned; SC1– SC2 only, ≤ 15 m

Strap yields in tension along its gross section before its connections, chord columns or anchors (capacity design to AISI S400 E3; connection by Method 1, 2 or 3)

C · CONVENTIONAL BRACED FRAME

D · CONVENTIONAL BRACED FRAME OVER 1 5 M

HSS, flat-bar or strap braces, or a steel plate wall, bolted or welded and designed for strength to CSA S16 27.12. Up to 15 m in SC3–SC4: no section-class limit. Above 15 m: Class 1 or 2 beams and columns (S16 27.12.4). Any eccentricity is included in member and connection design.

Any of the Class C brace types (HSS, flat bar, strap, or a steel plate wall); Class 1 or 2 beams and columns, and Class 1 or 2 HSS braces (S16 27.12.4 e); dynamic analysis; SC3 ≤ 60 m, SC4 ≤ 40 m

3 . 7 Crossbrace

The crossbrace is a diagonal member that connects to plates on the rim beams and braces the frame against in-plane racking. The four brace classes shown on the facing page are the module-wall members of the Seismic Strategy Ladder (§2.5), which describes how a class is selected for a building. This section describes the brace member, its connection plates, and its capacities. Class E moves the lateral system out of the module frame into a separate core or tower; see Tall Buildings.

Full crossbrace data (variants, the end-beam plate connection, and ULS) is available upon request.

Capacity

Brace capacity is project-specific. Each brace is sized for one building’s geometry in one location, so no capacity is published per class: the class sets the design rules on the facing page, and the building sets the size.

Fig. 3.7 — The sheet metal brace is bolted to a brace plate which is welded

Fig. 3.7b — The HSS brace connection (cell C opposite): the diagonal seats in a folded bracket (shown in bronze)

Fig. 3.7c — The flat-bar brace (cell D opposite) is bolted (shown in bronze) to a plate at the column and rim beam,

to the rim beam.

which is fastened to the rim beam.

and passes through slotted studs.

3.8 Dogbone

3.8.1 Function and Location

3.8.2 Connection role — horizontal (diaphragm)

3.8.3 The dogbone specialty connections

3.8.4 Customized variants

3.8.5 Method of production

3.8.6 ULS Capacity

3.8 Dogbone, page 34
Page 34Enlarge
Read page 34 as text

3 . 8 Dogbone

Function and Location

Every column has a top end plate and a bottom end plate. These plates are the surfaces against which adjacent modules align, face-to-face and top-to-bottom (see §1.3). The dogbone is the plate that is located in a recessed pocket machined into the top end plate. A dogbone is installed wherever a recessed top end plate exists. Its tapered edges pull the modules together horizontally while the dagger pulls them together vertically.

Connection role — horizontal (diaphragm)

In-plane shear between adjacent modules is carried by the dogbone plate acting between rim ceiling beams and the connected floor beams. The dogbone connects adjacent modules together and transfers diaphragm loads. No topping slab is assumed in the standard METALOQ building.

The dogbone specialty connections

Six further components are located at the module corners (see §3.10). They occupy the same position in the connection as the dogbone, and are ordered, tagged, and installed as part of the same family. Four of the six are machined locating brackets rather than plates. They are classified as dogbone specialty connections.

Customized variants

Three variants increase capacity. A fourth supports the corridor frame.

• Thicker Plate: A thicker plate with the same footprint provides higher in-plane shear capacity between modules.

• Wider Body: A wider body provides a longer bearing length across the connection.

• Higher-Strength Steel: Capacity increases by about 38% across the grades tabulated below. Shear increases from 80 kN to 110 kN, and tension from 150 kN to 207 kN.

• Supports for Corridor Frames: The dogbone position also receives the corridor frame that spans between two modules. That support is provided by the corridor connectors (§3.10).

Method of production

The dogbone is laser-cut from plate. The edges are then CNC-machined in fixtures to achieve the required tapered fit.

Full dogbone data (variants, installation, and the diaphragm force-transfer role) is available upon request.

ULS Capacity

Yield Fy (MPa)

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type Criterion

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 – 80 – 150 – Initiation of yielding

400 – 92 – 172 – Initiation of yielding

480 – 110 – 207 – Initiation of yielding

The three rows are one dogbone in three plate grades. Shear and tensile capacity scale with the yield strength of the plate; the geometry does not change.

Moment and compressive capacity are not applicable to the dogbone (– above): it is the horizontal connection / diaphragm-and-spacing element, transferring in-plane force between stacked modules. Installation is via a retaining bolt; toleranced (slotted) vs. datum hole-location variants affect fit-up, not the tabulated capacities.

All values are first-yield (initiation of yielding), not ultimate. Moment and shear capacities are pure values and are not concurrent.

3.9 Dagger

3.9.1 Connection role — horizontal alignment and vertical tension

3.9.2 Method of production

3.9.3 ULS Capacity

3.9 Dagger, page 35
Page 35Enlarge
Read page 35 as text

3 . 9 Dagger

Connection role — horizontal alignment and vertical tension

Vertical force transfer between stacked modules is carried by the dagger: a pin-and-socket system that locates the module laterally and carries axial tension through auxiliary tie hardware.

Fig. 3.9 — The standard dagger.

Method of production

The dagger is cold-sawn from barstock, then CNC-machined to form the taper and tapped to form the thread. The three variants differ in their threading.

Full dagger data (variants, hoisting roles, foundation connection, and ULS for dagger and dagger-plus-bolt cases) is available upon request. The roles and site sequence are described on the next page.

ULS Capacity

Yield Fy (MPa)

Moment Capacity

Shear Capacity

Comp. Capacity

Tensile Capacity

Fastener Type Criterion

Mr (kN·m)

Vr (kN)

Cr (kN)

Tr (kN)

350 – 216 – 78 M20 (ASTM A449) Initiation of yielding

350 – 216 – 87 M20 (Gr. 5) Initiation of yielding

350 – 216 – 87.6 M20 (A325) Initiation of yielding

350 – 216 – 109 M20 (A490) Initiation of yielding

All four rows are one 350 MPa dagger; only the M20 end-bolt grade differs. The bolt governs tensile capacity. Shear (216 kN) does not vary. The standard fastener is the A325 row: full designation ASTM F3125 Grade A325 (A325 is the superseded standard number, still the common shorthand).

Values are first-yield, not ultimate. Moment and shear are pure values and not concurrent. In the dagger, however, tension and shear act together.

3.9.4 Dagger Functions

3.9.5 The Four Functions

3.9.6 Three Variants

3.9.7 Site Sequence

3.9.8 The anti-prying wedge

3.9.4 Dagger Functions, page 36
Page 36Enlarge
Read page 36 as text

HOISTING

STANDARD SET

The dagger is installed narrow end down, with the bolts threaded into the dagger. The unthreaded upper holes accept a standard shackle and crane hook.

The dagger is threaded at both holes and bolted at the top. The module is tilted into position, then bolted through an access hole in the ceiling or the exterior elevation.

ALIGNMENT PIN

FOUNDATION CONNECTION

The pin is mounted to the module ceiling. It aligns the module above as that module is lowered into place.

The same dagger pair, welded to a base plate on the foundation wall, allows the standard connection to be made at grade.

Dagger Functions

The dagger is a single component, made in three variants, that performs four functions on site. The hoisting variant is distinguished by an unthreaded hole for the crane pick; the other variants are threaded. Together, the four functions provide horizontal locating, shear capacity, hoisting, and vertical tension. Under wind overturning or seismic uplift, where upward loads above approximately 1.0 g can exceed the weight of the building, the dagger is the component that ties the building together vertically.

The Four Functions

• Hoisting: The module is lifted using a dagger. The lift point is a component from the same family used for the structural joint, installed for the lift and removed afterward, not a lug welded on for the crane. It is the only variant identifiable by its hole: the hoisting dagger’s hole is unthreaded, while every other dagger is threaded. This distinguishes it from a structural dagger reused for lifting; it is designed specifically to be bolted through and removed after the module is set, while the threaded (permanent) variant remains in place.

• Standard Set (permanent joint): A dagger bolted under the incoming module engages the plate of the module below, and is bolted again from the far side. This connection carries shear and vertical tension between stacked modules, and is the connection described by the ULS capacities on the preceding page.

• Alignment Pin: A pin left pointing upward from the ceiling plane of an already-placed module locates the module being set above it. The incoming module finds the taper before contacting any other surface, and is guided into position without adjustment.

• Foundation Connection: The same joint type is used at the ground connection. A pin projects upward from the foundation base plate, and the first module lands on it in the same way a module lands on the one below it. This means the building connects to its foundation using the same interface used throughout the stack, rather than a separate detail at grade. See Foundations (§5).

Three Variants

Four jobs are performed by three physical components. What differs between variants is the thread location and taper direction.

• Standard: Threaded top and bottom. The bolt passes through the mating plate into the dagger; the plate carries a tapered ramp at the bolt seat so tightening produces no eccentricity and no prying.

• Hoisting: Threaded at the bottom only; the unthreaded top takes a shackle. Installed in the ground-level modules before the lift (it may leave the factory already installed), and removed as soon as the module is placed.

• Foundation Pin: Projects upward from a foundation base plate. It has a short taper to locate the hole, a tapered body, and an anti-prying wedge under the bolt head. See Foundations (§5).

Site Sequence

Modules are lowered at a slight tilt so they do not slide down the faces of adjacent modules. The dagger projects downward from the incoming module and engages its socket. Once a module is placed, the ground-module hoisting daggers are removed, and the next layer arrives with its daggers already projecting downward. Any feature that projects upward from a layer of modules complicates waterproofing, which is the most common site problem in volumetric modular construction. For this reason, the locating feature points down and the module top remains clear. During transport, the same feature ties the module to dunnage on the truck deck without chains or come-alongs.

The anti-prying wedge

The wedge shape on the lower end sits against a parallel tapered plate so no prying force is generated.

DESIGN RULE The up-facing exception — install ahead of the set

Hoisting and the alignment pin use a dagger installed in the ceiling plane pointing up. This is the one exception to the rule that nothing projects above a module top. An up-facing dagger does penetrate the temporary roofing, so it is not fitted in the factory and left exposed to the weather. It is installed in the field, on a dry day, immediately ahead of the modules it will receive. The crew installs these daggers, and the next modules are set on them in the same shift.

3.9.9 Dagger Connections

3.9.10 Fasteners and Torque

3.9.9 Dagger Connections, page 37
Page 37Enlarge
Read page 37 as text

FROM INSIDE CEILING ACCESS PANEL

FROM OUTSIDE OPENING IN SHEATHING

Dagger Connections

Once a module is set, its dagger connection is bolted in the field. The bolts can be reached from inside the unit, through an access panel in the ceiling, or from outside, through an opening in the exterior sheathing. Either way, the opening is small and is closed as soon as the connection is made.

FROM INSIDE · PREFERRED

The connection is reached through a 10″ × 10″ opening in the ceiling. The opening is closed with a simple 1-hour fire- rated access panel or, alternatively, a drywall patch. This method suits modules whose exterior cladding is already installed, because patching the interior is easier than opening the cladding.

FROM OUTSIDE

The connection is reached through an opening in the exterior sheathing. Once the connection is made, the sheathing is patched and the air barrier is completed over it. This method suits buildings whose exterior cladding is installed on site.

Fasteners and Torque

Every bolted connection in the system uses one of the fasteners below. Tighten each to the dry torque listed.

Part number Fastener Grade Torque

Where it's used

dry, ft·lb

MQ-COTS-0002 3/4-10 heavy hex nut F432 – Nut for 0003

MQ-COTS-0003 3/4-10 × 1-3/4″ heavy hex bolt A325 or Grade 8 375 Dagger and column end-plate connections

MQ-COTS-0004 1/2-13 × 1-1/4″ flat head cap screw Grade 8 70 Rim beam end to shear-channel flange, flush (nut 0005)

MQ-COTS-0005 1/2-13 serrated flange nut Grade 8 – Nut for 0004, 0011 and 0012

MQ-COTS-0011 1/2-13 × 1-1/4″ hex flange bolt Grade 8 110 Rim beam web to shear channel (nut 0005)

MQ-COTS-0012 1/2-13 × 1-1/2″ hex flange bolt Grade 8 110 Corridor connectors to rim beams (nut 0005)

MQ-COTS-0014 3/8-16 serrated flange nut Grade 8 – Nut for 0020

MQ-COTS-0018 1/2-13 × 1″ low-profile socket head cap screw Grade 8 56 Roof ties to column top end plate (tapped)

MQ-COTS-0020 3/8-16 × 1″ serrated flange bolt Grade 8 45 Joist clamp: backplate, joist web and rim- beam tab (nut 0014)

MQ-COTS-0021 3/4-10 × 3″ hex flange bolt Grade 8 375 —

MQ-COTS-0023 3/8-16 × 3/4″ low-profile socket head cap screw Grade 8 24 —

MQ-COTS-0025 1/4-20 serrated flange nut Grade 8 – Nut for 0026

MQ-COTS-0026 1/4-20 × 3/4″ flat hex head screw Grade 8 10 Cross-brace band to brace plate (nut 0025)

MQ-COTS-0029 1/4-20 × 1-1/2″ flat hex head screw Grade 8 10 —

Torque values are for dry threads. Sources: Portland Bolt (hex and flange bolts) and Unbrako (cap screws). Nuts take no separate value; torque is applied at the bolt.

3.10 Corridor Connectors

3.10.1 Taper-Lock Interconnector

3.10 Corridor Connectors, page 38
Page 38Enlarge
Read page 38 as text

DOGBONE CORRIDOR CONNECTOR

FOUNDATION BOX CORRIDOR CONNECTOR

MID-SPAN CORRIDOR CONNECTOR

TWO MOD DOGBONE

LEFT DOGBONE CORRIDOR CONNECTOR

RIGHT DOGBONE CORRIDOR CONNECTOR

3 . 1 0 Corridor Connectors

Six machined components are located at the module corners, where the corridor frame is supported and where the lowest module connects to the foundation. The corridor connector brackets are aligned with the depth of the rim ceiling beam and project into the corridor space, so that a corridor frame can sit on top of them and be bolted down. Each component is labelled on the facing page. They are classified as dogbone specialty connections because they occupy the same position in the connection as the §3.8 dogbone and belong to the same family. Four of the six are locating brackets rather than plates.

Tag as marked on the facing page

METALOQ code the SSOT identity

Form Role — where it works

The standard corner pickup for the corridor frame; the flange slot is what separates it from the mid- span connector.

Dogbone — Corridor Connector

MQ-W-TLC- COR-0002

Bracket + slotted top flange

The foundation-level variant: a steel fabricated box that can be cast into a pocket in the foundation wall. Solid, not a bracket: nothing seats into it from below.

Foundation Box — Corridor Connector

MQ-W-TLC- COR-0003

Solid block, 2 top + 2 face holes

The intermediate pickup between corners. No flange, because nothing ties across the module line here.

Mid-span Corridor Connector MQ-W-TLC- COR-0004 Bracket, no flange

The one of the six that is not a corridor connector. It ties two modules directly to each other, hence a flat plate with no vertical lock.

Two Mod Dogbone MQ-W-TLC- COR-0005 Flat notched plate

Identical to the standard corridor connector (COR-0002), but for the end of a corridor, where the corridor frame needs its end supported. Handed pair with the right-hand connector.

Left Dogbone — Corridor Connector

MQ-W-TLC-COR- L-0001

Bracket + flange extending left

Right Dogbone — Corridor Connector

MQ-W-TLC-COR- R-0001

Bracket + flange extending right The opposite hand of the same condition.

Engineering data for the governing variants is available upon request.

Taper-Lock Interconnector

TLC, the code carried by every component in this section, stands for Taper-Lock Connector. The Taper-Lock Interconnector is a separate component and is not shown on this page. It is the side-to-side lock between laterally adjacent modules, and is distinct from the dogbone plate.

Tell us about your project.

Talk to us